My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-22-2021 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2020-2029
>
2021
>
11-22-2021 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:34 AM
Creation date
11/23/2021 10:17:58 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
11/22/2021
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
11/22/2021
EDA Document Type
Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Mounds View Economic Development Authority <br />Tax Increment Financing District No. 1-7 (Skyline Apartments) 9 <br />The estimates listed above display the captured tax capacity when all <br />construction is completed. The tax rate used for calculations is the Pay 2021 <br />rate. The total net capacity for the entities listed above are based on Pay <br />2021 figures. The District will be certified under the Pay 2022 rates, which <br />were unavailable at the time this TIF Plan was prepared. <br />Pursuant to M.S. Section 469.175 Subd. 2(b): <br /> <br />(1) Estimate of total tax increment. It is estimated that the total amount <br />of tax increment that will be generated over the life of the District is <br />$4,941,080; <br /> <br />(2) Probable impact of the District on city provided services and ability <br />to issue debt. An impact of the District on police protection is <br />expected. With any addition of new residents or businesses, police <br />calls for service will be increased. New developments add an <br />increase in traffic, and additional overall demands to the call load. <br />The City does not expect that the proposed development, in and of <br />itself, will necessitate new capital investment in vehicles or facilities. <br /> <br />The probable impact of the District on fire protection is not expected <br />to be significant. Typically, new buildings generate few calls, if any, <br />and are of superior construction. The pre-existing building had <br />public safety concerns and no built-in fire protection. The City does <br />not expect that the proposed development, in and of itself, will <br />necessitate new capital investment in vehicles or facilities. <br /> <br />The impact of the District on public infrastructure is expected to be <br />minimal. The development is not expected to significantly impact <br />any traffic movements in the area. The current infrastructure for <br />sanitary sewer, storm sewer and water will be able to handle the <br />additional volume generated from the proposed development. <br />Based on the development plans, there are no additional costs <br />associated with street maintenance, sweeping, plowing, lighting and <br />sidewalks. <br /> <br />The probable impact of any District general obligation tax increment <br />bonds on the ability to issue debt for general fund purposes is <br />expected to be minimal. It is not anticipated that there will be any <br />general obligation debt issued in relation to this project, therefore <br />there will be no impact on the City's ability to issue future debt or on <br />the City's debt limit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.