Laserfiche WebLink
Building Inspections Conducted Outside Normal $63.25/hour (two-hour minimum charge) <br />Business Hours <br />Change of Address $150 <br />Change of Occupancy $75 <br />Comprehensive Plan Amendment $500 <br />Conditional Use Permit, R-1 or R-2 $200 <br />Conditional Use Permit, All Other Districts $400 <br />Conditional Use Permit Amendment Same as CUP Fee <br />Contractor License (Chapter 1001Title XV, Chapter <br />$60 <br />150.053)) <br />Contractor State License Verification Fee $5 per permit <br />Development/Site Plan Review $400 <br />Escrow – Manufactured Homes $500 per permit <br />Escrow – Occupancy (Seed, sod, landscaping; as-$1,000 for each item <br />building grading survey; driveway installation; curb <br />cut modifications; site clean-up; storm water <br />management; drainage features; site erosion; right- <br />of-way restoration; or any other items as determined <br />by the Building Official) <br />No Charge (Chapter 1012Title XI, Chapter 119) <br />Housing Inspection Initial and One Follow-Up <br />(includes now shows) <br />Housing Inspection/No Show, each additional $100 <br />Interim Use Permit (IUP) $400 <br />IUP Amendment $400 <br />Park Dedication Fees (Ord. 745) Residential: $3,500 per unit <br />Non-Residential: Up to 10% of estimated market <br />value (of land) <br />Plan Review (Payment Required Before Plans are 65 percent of permit fee for all commercial permits <br />Reviewed) and for residential permits for new dwellings, dwelling <br />additions, garages, garage additions, decks, sheds <br />over 200 square feet, and major remodeling. <br />Plan Review for Changes, Revisions, or Additions to $47/hour (one half-hour minimum charge) <br />Plans <br />Plan Review, Engineering (Applicable to any project $100 per permit <br />that changes the grade. To be determined by Staff <br />during application review). <br />Plan Review for Outside Consultants for Plan Actual costs including administrative and overhead <br />Checking and Inspections or Both costs <br />Plan Review Similar (all units are same or similar) Each unit after the first shall be 25% or original fee <br />Planned Unit Development (PUD) Chapter $750 <br />1120(Title XV, Chapter 160.300) <br />PUD Amendment $400 <br />Refund, Permits (within 100 days of application if All but $40 <br />work is not commenced) <br />Refund, Plan Review 100% (If review has not been done) <br />Refund, State Surcharge 100% <br />Rezoning $500 <br />Vacation, Street or Easement $250 <br />Subdivision $750 <br />Subdivision Escrow $1,000 - $10,000 (at the discretion of the City <br />Administrator) <br />Subdivision (Reapproval Fee) $100 <br />Text Amendment, Zoning Code $400 <br />Text Amendment, Other City Code $300 <br />2022 Mounds View Fee Schedule Page 4 of 14 <br /> <br />