Source
<br />CodeTitle _ DasalpNwl
<br />e'er},,, ,ng rldler ufryri,, at gat hr piano, : uo;-ling and transporting of materials from the planr to the lab for lab testing,
<br />plant i eviews, and operations; investigating plant discrepancies; and other technical services in the plant or office associated with
<br />1733 Concrete Plant Inspections stationary concrete plants or mobile concrete paving plant inspection
<br />Performing construction phase material inspection and engineering, for structural steel, precastand pre -stressed concrete,
<br />reinforcement steel, and electrical products and related technical services in the Field and office for materials to be used in
<br />multiple projects. Includes travel time, sampling, and sample delivery- Includestasks related to reviewingshop drawings furnished
<br />bysuppkers or fabricators and contractor working drawings or calculations, and for tasks related to structural metals inspection
<br />(materials surveys, physical and chemical laboratory testing, material inspection and engineering, and technical services in the
<br />1734 Construction Materials Inspections field and offices).
<br />1802 Construction Surveying Use for surveys to provide staking for the contractor's operations and for any other construction phase surveying
<br />All surface crack sealing, crackfiifing, or rout and seal operations. Includes related materials, hauling, stockpiling, and traffic
<br />2106 Crack Sealing control.
<br />3023 Elec Comm Eq Rep - Miles
<br />0400 Equipment Calibration -Mat Insp
<br />Use when performing periodic equipment calibration for equipment used in the materials lab or on construction projects.
<br />All construction project field inspection (not cyclical inspection of assets), including preparatory plans R spec review,
<br />measurement, and verification other than environmental monitoring. Includes field inspection of materials such as gradations,
<br />densities/DCP, proctors, compaction, slump tests, and field air tests. Witnessing claims, determination and computation of pay
<br />quantities, materials control and certification for progress vouchers, but not for final payments, Includes collecting and
<br />transporling samples for lab tests, but not the actual laboratory verifications Includes all construction phase project related
<br />activities for project and resident engineers such as problem resolution, guidance and direction to field technicians Includes all
<br />miscellaneous lield engineering expenses used by district offices such as space rental, utilities, or other costs charged to the
<br />construction project Includes all work associated with evaluation of implementation of intelligent compaction devices to
<br />1800 Field Inspn Guu
<br />determine if construction contract terms have been met
<br />All districtfield and office tasks needed to respond to supplemental °Requests for Survey Data" and add the data to the surveys
<br />1040 Final Design Surveys
<br />base map or DTM.
<br />Use for time, materials, and travel expenses when developing or delivering training includes course preparation, designing
<br />0601 Gen Training Preparation - Delivery
<br />materials, and managing training records
<br />Install, repair, or maintain low tension cable, plate beams, and end treatments; cable tension adjustments; and reflector
<br />2210 Guardrail-Install/Repair/Maintenance
<br />replacement Includes related traffic control.
<br />2624 Indirect Expense
<br />Indirect shop expenses and shop equipment Allocate to mobile equipment
<br />All work related to installing, maintaining, restoring, or removing highway lighting systems and fixtures. Includes repairing,
<br />maintaining, or replacing supports necessary for roadway righting luminaries. Includes patrol highway lighting, inspect lighting
<br />structures, electrical service far highway lighting, re-lamping, pump stations, anti -icing systems, truck roll-over warning systems
<br />and electrical repairs. Includes traffic control in support of roadway lighting activities. Use for tasks related to publle
<br />1871 Oahnng Mointend ncc $ U1041cs
<br />inquiries/complaints, revlewutiliry billings, provide date, and conductfield reviews.
<br />Page 2 of 5
<br />The Mounds View Vision
<br />A Dwiving Desirable Community
<br />
|