My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/06/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/06/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:48:31 PM
Creation date
6/13/2022 10:16:29 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/13/2022
Supplemental fields
City Council Document Type
Packets
Date
6/13/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
decision, and the Contractor shall accept his interpretation as final and binding. <br />See paragraph 3.05 for additional temperature and humidity limitations. <br />M. A daily inspection of the separators and compressed air supply will be required <br />to insure cleanliness of all compressed air supplied for abrasive blasting. This <br />test will be performed by a blotter test. A clean white Blotter is held, no more <br />than 18 inches, from the air supply, down stream of moisture and oil separators. <br />The air supply is directed at the Blotter for approx. (2) two minutes. The Blotter is <br />then examined visually for signs of oil and moisture. A clean blotter at test <br />completion means a successful passing of the air supply test. Failure to pass the <br />compressed air test will be justification for rejection of abrasive blasting <br />performed that day. The Engineers discretion will be final in this determination. <br />3.04. APPLICATION <br />A. Apply coatings in accordance with manufacturer's instructions. <br />B. Paint metal unless specified otherwise. <br />C. Spot repair and recoat all exterior and interior surfaces where the existing <br />coating system is damaged from welding or other means. <br />D. Mix and thin coatings, including multi -component materials, in accordance with <br />manufacturer's instructions. Apply each coat at proper consistency. <br />E. Tint each coat of paint slightly darker than preceding coat. When multiple coats <br />of same material are specified, tint prime coat and intermediate coats with <br />suitable pigment to distinguish each coat. <br />F. Keep containers closed when not in use to avoid contamination. <br />G. Do not use mixed coatings beyond pot life limits. <br />H. Use application equipment, tools, pressure settings, and techniques in <br />accordance with manufacturer's instructions. <br />I. Uniformly apply coatings at spreading rate required to achieve specified DFT. <br />Thickness of coatings and paint shall checked with a non-destructive, <br />magnetic -type thickness gauge, as per SSPC-PA 2 Procedure for Determining <br />Conformance to Dry Coating Thickness Requirements. Dry film thickness (DFT) <br />readings of the coating are taken to provide reasonable assurance that the <br />specified minimum DFT has been achieved. A minimum of five (5) separate spot <br />measurements shall be made over every 100 square feet in area. Each spot <br />measurement shall consist of an average of three (3) gage readings next to each <br />other no further than six (6) inches apart. Each spot measurement must be <br />within the specified minimum thickness. The single gage readings, however, <br />making up the spot measurement, are permitted to be no less than 80 percent of <br />the specified minimum thickness. <br />J. Do not apply coatings on surfaces that are not sufficiently dry. Allow surfaces to <br />dry, except where coating manufacturer requires surface wetting before coating. <br />K. Drying and Recoating: <br />1. Allow each coat of finish to dry before following coat is applied, unless <br />directed otherwise by manufacturer. <br />P05367-2016-000 / Mounds View 09 96 20 - 11 PRESSURE VESSEL COATING <br />2019 WTP Rehabilitation SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.