My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-26-2022 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2020-2029
>
2022
>
09-26-2022 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:16:18 AM
Creation date
9/21/2022 8:32:28 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
9/26/2022
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
9/26/2022
EDA Document Type
Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Exhibit A4 Page 12 <br />Agreement between the City of Mounds View and Center for Energy and Environment <br />DOCSOPEN\MU205\13\821952.v1-9/8/22 <br />General Program Conditions <br /> <br />Application Processing: Loans will be distributed on a first come first serve basis as applicants qualify. <br />Applicants must provide a completed application package including the following in order to be <br />considered for funding. <br /> Completed and signed application form <br /> Proof of income <br /> Bids or estimates for proposed projects <br /> Other miscellaneous documents CEE may require <br /> <br />Contractors/Permits: Contractors must be properly licensed. Permits must be obtained when required <br />by City ordinance. <br /> <br />Program Costs: Loan origination, post installation inspection and remodeling advisor visit fees will be <br />paid per the Program Budget. Loan program marketing efforts will be billed directly to the City of <br />Mounds View EDA and is a separate expense should the City of Mounds View EDA choose to commission <br />CEE for marketing support. Borrowers will pay all mortgage filing fees and related closing costs. <br /> <br />Total Project Cost: It is the borrower’s responsibility to obtain the amount of funds necessary to finance <br />the entire cost of the work. In the event the final cost exceeds the original loan amount, the borrower <br />must obtain the additional funds and show verification of the additional funds in order to be approved <br />for the loan. <br /> <br />Disbursement Process: Payment to the contractor (or owner in sweat equity situations) will be made <br />upon completion of work. An inspection will be performed by a City Inspector and/or CEE to verify the <br />completion of the work. The following items must be received prior to final disbursement of funds: <br />• Final invoice or proposal from contractor (or materials list from supplier); <br />• Final inspection verification by a City Inspector (or CEE); <br />• Completion certificate(s) signed by borrower and contractor; <br />• Lien waiver for entire cost of work; and <br />• Evidence of City permit (if required). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.