My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/10/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/10/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:41 PM
Creation date
11/14/2022 10:44:46 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/24/2022
Supplemental fields
City Council Document Type
Packets
Date
10/24/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDEX <br />L Building/Community Development Fees <br />ll. Other Inspection / Planning Fees <br />111. Miscellaneous (copies, maps, agenda, etc.) <br />IV. Police/Administrative Offenses <br />V. Licenses <br />Vl. Parks, Recreation, and MVCC Facility Rental Fees <br />VII. Public Works/Municipal Utility Fees <br />Appendix A - 2020 MN State Statutes: 326B.153 Building Permit Fees <br />Appendix B - 2020 MN State Statutes: 326B.148 Surcharge <br />Page 5 <br />Page 5_ <br />Page 6 <br />Page 8 <br />Page 11 <br />I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES <br />Building Permit (State Surcharge Required, See <br />Fees shall be based on valuation according to Appendix <br />Appendix B) <br />A, unless specifically noted otherwise or as determined by <br />the Cit 's Building Official <br />Building Permit Plan Review <br />65% of Building Permit Fee (Building Official may waive <br />plan review fee for certain projects that require diminutive <br />plan review such as partial basement finishes, kitchen <br />remodeling, and minor repairs/alterations. <br />Building Permit Reins ection <br />$63.25 per State Statute 326B.153 <br />Building Permit Investigation Fee (starting work <br />Equivalent to permit fee <br />without an approved/issuedpermit) <br />Renewable Energy System (Solar PV Building <br />$150 <br />Permit: Small Rooftop Streamlined, Geothermal, <br />Wind Energy Conversion) — Residential <br />Renewable Energy System (Solar, Geothermal, <br />See Appendix A <br />Wind Energy Conversion) — Commercial <br />Billboards/Billboard Alterations includes Footings) <br />$250 per billboard plus surcharge <br />Roofing or Siding — Single Family Residential <br />$100 <br />Partial (less than 25%) of principal structure; or <br />$65 <br />Detached Accessory Structures only <br />Roofing or Siding — Townhomes and rental <br />$60 per unit <br />properties up to five units <br />Roofing or Siding — Commercial <br />See Appendix A <br />Window or Door Replacement <br />$65 for one window or door <br />within existing openings) <br />$100 for two or more windows and/or doors <br />Telecommunications Antenna — New System <br />$750 plus engineering/inspection fees if located on City - <br />owned property plus surcharge (see Public Works for <br />further information <br />Telecommunications Antenna — Repairs/ <br />$250 per permit plus surcharge <br />Alterations/Swapping or Adding Antennas to <br />Existing System(City or Private Property) <br />Electrical Permits, State of MN <br />Established by the Minnesota State Boards of Electricity <br />Fire Inspections DHS <br />$50 <br />Fire Panel Systems <br />See Appendix A <br />Fire Permit (no surcharge), All permits unless <br />$100 <br />noted otherwise <br />Fireworks Display/Fireworks Sales <br />$100 <br />Fireworks Sales Only Businesses <br />$350 <br />Fireworks Sales with other Retail Businesses <br />$100 <br />Fire Permit, Temporary Tent <br />$50 <br />Fire Permit, Tank Installation fuel, oil, gas, etc. <br />$100 pertank <br />2023 Mounds View Fee Schedule Page 2 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.