Laserfiche WebLink
2. Only one waived fee per year per Non -Profit is allowed. <br />3. Non -Profit's making and receiving the waiver are still required to submit a $200 security deposit to cover damages <br />and cleaning. <br />4. Non -Profits making and receiving the waiver must clean the facility and remove all trash or will forfeit their $200 <br />deposit. <br />5. Residents/Neighborhood Groups requesting use of a Park Facility for Night to Unite are required to pay the $25 <br />security deposit for the key and sign a use agreement that details cleanup and usage requirements. <br />VII. PUBLIC WORKS RELATED FEES <br />Call -Out Rate Schedule Based on Current Wa es <br />Normal Business Hours for Call -Out Rates <br />7:00 am to 3:00 pm, Monday thru Friday <br />After Hours Call -Out Rate, Specified Time <br />Conducted Outside Normal Business Hours <br />$100/hr (Minimum 2 hours) <br />Holiday Call -Out Rate, Specified Time Conducted <br />on Holidays <br />$150/hr (Minimum 2 hours ) <br />Right -Of -Way Management Fees (Title V, Chapter 54) Additional Fees May be Required for Legal and <br />Engineering Costs Incurred by the City) All issued right-of-way permits will include a $125 <br />administrative fee. <br />Excavation, Hole Fees, Boulevard Areas <br />$100 per hole <br />Excavation, Hole Fees, Pavement Areas <br />$200 per hole <br />Excavation, Underground Utility Work, Open <br />Trenching — Boulevard Areas Open <br />$50 per 100 lineal feet or fraction thereof (requires hole <br />fee <br />Excavation, Underground Utility Work, Open <br />Trenching — Pavement Areas <br />$70 per 100 lineal feet or fraction thereof (requires hole <br />fee <br />Excavation, Trenchless Installation <br />$35 per 100 lineal feet or fraction thereof <br />Excavation, Overhead Installation <br />$25 per 100 lineal feet or fraction thereof <br />Obstruction, New Pavement <br />$100 per obstruction <br />Obstruction, Replace Existing Obstruction (in- <br />kind <br />$50 per obstruction <br />Temporary Obstruction, Dumpster, Portable <br />Restroom, etc. <br />$25 per obstruction <br />Temporary Obstruction, Equipment Used for <br />Excavation <br />No Charge <br />Miscellaneous ROW Management Fees and Costs (Discount for Work Done Pertaining to City Project; <br />Additional Fees May be Required for Legal and Engineering Costs Incurred by the City) <br />Street Opening Permit (Requires Deposit) <br />$200 <br />Street Opening Deposit <br />To be determined by the Director of Public Works <br />Registration Fee ROW Users and Registrants) <br />$30 <br />Permit Extension <br />$30 <br />Delay Penalty <br />10% of ROW Permit <br />Degradation Fee <br />Calculated at time of permit <br />Restoration Cost <br />Calculated at time of permit <br />Overhead Utility Line Repair <br />No Charge <br />Penalty for Work Done without a Permit <br />Double Fee 50% <br />Municipal Water System Fees (Title V, Chapter 52 <br />Water Availability Charge AC , Residential <br />$500 per unit <br />WAC Charge, Commercial/Industrial <br />$1,000 per acre of developable land ($1,000 minimum <br />charge) <br />Residential Water Usage Base Charge <br />$24.-AO $21.00 Der quarter <br />Residential Water— 0 to 12,000 gallons <br />$240 JZ.70 per 1,000 gallons per quarter <br />Residential Water— 12,000 to 24,000 gallons <br />$2-.&6 Jg.97 per 1,000 gallons per quarter <br />Residential Water — Over 24,000 gallons <br />$fig IL42 per 1,000 gallons per quarter <br />Commercial Water Usage Base Charge <br />1 $2 -.90 21.00 per quarter <br />Commercial Water— 0 to 125,000 gallons <br />I " 1230 per 1,000 gallons per quarter <br />2023 Mounds View Fee Schedule Page 11 of 14 <br />