Laserfiche WebLink
SWM Utility Rate Charge, R-3 Medium Density <br />$91.91 $87.37 per acre per quarter <br />Residential <br />SWM Utility Rate Charge ,R-4 High Density <br />$97.12 $103.60 per acre per quarter <br />Residential, R-5 Mobile Homes and R-O <br />Residential Office <br />$127.22 $135.71 per acre per quarter <br />SWM Utility Rate Charge ,13-1 Neighborhood <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />SWM Utility Rate Charge, 1-1 Industrial <br />$99-33 $109.96 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />$112.65 $120.16 per acre per quarter <br />Development <br />SWM Utility Rate Charge, CRP Conservancy, <br />$15.00 $16.00 per acre per quarter <br />Recreation and Preservation <br />SWM Utility Rate Charge, School or Church, <br />$46.71 $48.76 per acre per quarter <br />Public or Private <br />Illicit Discharge Fee <br />To be determined by the Public Works Director on a case - <br />by -case scenario. <br />Storm Water Management (The permit fee schedule adopted 08124/2016 by the Rice Creek Watershed District <br />Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are <br />exempt from the permit fees). <br />Rule C (Storm water Management): <br />Single lot, single family residential projects <br />Home, Accessory Structure, Driveway, Etc. $150 <br />Residential, Commercial, Industrial, Institutional Develo ment <br /><1 acre of new or reconstruction impervious <br />surface <br />$1,000 <br />1-2.5 acres of new or reconstructed <br />impervious surface <br />$2,000 <br />2.5-5 acres of new or reconstructed <br />impervious surface <br />$3,500 <br />>5 acres of new or reconstructed <br />impervious surface <br />$5,000 plus $1,000 per acre (capped at $10,000) <br />Rule D Erosion Control Plans): <br /><2.5 acres of land disturbance <br />$100 <br />2.5-10 acres of land disturbance <br />$250 <br />>10 acres of land disturbance <br />$500 <br />Rule E (Floodplain Alteration) <br />No mitigation required <br />No Fee <br />Mitigation required <br />$100 <br />Rule F (Wetland Alteration) <br />Exemption <br />$250 <br />< 1 acre of mitigation required <br />$875 <br />1-5 acres of mitigation required <br />$1,750 <br />5-10 acres of mitigation required <br />$3,500 <br />>10 acres <br />$5,250 <br />Banking Plan <br />$1,750 <br />Rule G (Regional Conveyance Systems): <br />$500 <br />Rule I Public Drainage Systems): <br />$500 <br />Note: An action that requires a permit under both Rule G and Rule I will be subject under those rules to a single permit <br />fee of $500. Additionally, if the action is one for which a bond for costs has been provided under MN Statute 103E, a Rule <br />G/Rule I fee will not be required. <br />Rule J Appropriate of Public Water): <br />No Fee <br />Rule L (Variances): <br />Variable. See District Permit Variance Guidance Policy <br />Storm Water Connection/Re air/Disconnect <br />$100 plus surcharge <br />2023 Mounds View Fee Schedule Page 13 of 14 <br />