My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/10/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/10/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:21 PM
Creation date
11/14/2022 10:46:47 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/3/2022
Supplemental fields
City Council Document Type
Packets
Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WORK PLAN <br /> 3.4 PUBLIC ART PROGRAMMING <br />Part of the predesign manual <br />development process, includes <br />looking for areas where public <br />art can be incorporated into <br />the project, per state statute, <br />if it is required as part of the <br />request. This project could <br />incorporate a community <br />involvement within the process <br />to ask about a community art <br />piece or implementation that <br />could enhance the appeal of <br />the project to the community <br />and the legislative body. As <br />part of the programming phase for this project, we would include notes and potential ideas for <br />inclusion of public art within the project for implementation during the execution of the final <br />design phases. <br />4.0 CONCEPTUAL DESIGN DEVELOPMENT <br /> <br /> 4.1 DESIGN PROCESS DELIVERABLES <br />During conceptual planning, our team will review the previous concept idea and how it <br />continues to meet or does not meet the established programmatic space needs as part of this <br />predesign process. Our team will investigate design options that meet the programmatic goals in <br />the best way the site can accommodate and review those options with the entire project team. <br />These options will address the opportunities and challenges of each option to meet the program <br />needs. This planning will typically take several weeks to complete as we coordinate options and <br />review meetings to get our team on the same page. <br />4.1.1 SITE AND BUILDING PLANS- We will develop plans that illustrate a high level of initial <br />detail to illustrate a feasible plan quality. This plan development allows building system <br />engineers to offer quality design input so we can better estimate the potential project costs. <br />4.1.2 ELEVATIONS & SECTIONS- Elevations and simple building sections will be used to <br />illustrate building mass and form that will be informed by building system engineers for a <br />more complete project cost estimate. <br />EDINA SOUTHDALE WATER TREATMENT FACILITY <br />MOUNDS VIEW COMMUNITY CENTER 8
The URL can be used to link to this page
Your browser does not support the video tag.