My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2022/10/03
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
Agenda Packets - 2022/10/03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:21 PM
Creation date
11/14/2022 10:46:47 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/3/2022
Supplemental fields
City Council Document Type
Packets
Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
112
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SCHEDULE <br />1.0 PROJECT MANAGEMENT <br />2.0 REDISCOVERY <br />3.0 SITE AND BUILDING SPACE NEED PROGRAMMING <br />4.0 CONCEPT DESIGN DEVELOPMENT <br />5.0 PRE-DESIGN DELIVERABLE <br />1.1 Kick Off Meeting <br />1.2 Bi-Weekly Check-ins <br />2.1 Initial Concept Staff and Stakeholder Feedback <br /> a) Kick-Off Meeting - Goal Setting <br /> b) Online Survey Feedback Loop <br />2.2 Evaluation and Collection of New and Additional Detail <br /> a) Stormwater Study <br /> b) Event Programming and Fiscal Feasibility Study <br /> c) Zoning Study <br /> d) Technical Survey <br /> e) Geo-technical Evaluations <br /> f) Precedent Studies (Examples of Similar Projects) <br />3.1 Site Analysis and Contextual Review <br />3.2 Detailed Space Programming <br /> a) Gym Space and Spectator Demand <br /> b) Community Fitness Functions <br /> c) Community Meeting, Gathering, and Serving Functions <br /> d) Locker Room Demand and Size <br /> e) Office and Administrative Functions <br /> f) Building Function and Support Spaces <br />• Restrooms <br />• Storage <br />• Mechanical and Electrical <br />3.3 Sustainability Programming <br /> a) Minnesota B3 Programming <br /> b) Consideration of Heating and Cooling Systems <br />3.4 Public Art <br />4.1 Design Progress Deliverables <br /> a) Building and Site Plans <br /> b) Elevations and 3D Modeling <br /> c) Concept Cost Comparison <br />4.2 Stakeholder and Community Demonstration and Feedback <br />4.3 Preferred Concept Selection <br />5.1 Minnesota Pre-Design Manual for Capital Projects <br />5.2 Plans <br />5.3 Elevations <br />5.4 Renderings <br />5.5 Total Project Cost Opinion OCTOBER 10, 2022NOVEMBER 2022DECEMBER 2022JANUARY 2023PRIMARY TASK DURATION <br />TASK SPILL/EXTENSION <br />REGULARLY SCHEDULED TOUCH POINTS <br />WORK TASK DURATION <br />WORK TASK SPILL/EXTENSION <br />WORK TASK COMPLETION GOAL <br />KICKOFF MEETING / OWNER PROVIDED DELIVERABLE <br />TASK SCHEDULE KEY: <br />MOUNDS VIEW COMMUNITY CENTER 21
The URL can be used to link to this page
Your browser does not support the video tag.