My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 993
MoundsView
>
Commissions
>
City Council
>
Ordinances
>
2020-2029
>
2022
>
Ordinance 993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 10:17:54 AM
Creation date
11/17/2022 11:57:49 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Ordinances
MEETINGDATE
11/14/2022
Commission Doc Number (Ord & Res)
993
Supplemental fields
City Council Document Type
Ordinances
Date
11/14/2022
Resolution/Ordinance Number
993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2023 Mounds View Fee Schedule Page 2 of 14 <br />INDEX <br />I. Building/Community Development Fees Page 2 <br />II. Other Inspection / Planning Fees Page 3 <br />III. Miscellaneous (copies, maps, agenda, etc.) Page 5 <br />IV. Police/Administrative Offenses Page 5 <br />V. Licenses Page 6 <br />VI. Parks, Recreation, and MVCC Facility Rental Fees Page 8 <br />VII. Public Works/Municipal Utility Fees Page 11 <br />Appendix A – 2020 MN State Statutes: 326B.153 Building Permit Fees <br />Appendix B – 2020 MN State Statutes: 326B.148 Surcharge <br /> <br />I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES <br />Building Permit (State Surcharge Required, See <br />Appendix B) <br />Fees shall be based on valuation according to Appendix <br />A, unless specifically noted otherwise or as determined by <br />the City’s Building Official <br />Building Permit Plan Review 65% of Building Permit Fee (Building Official may waive <br />plan review fee for certain projects that require diminutive <br />plan review such as partial basement finishes, kitchen <br />remodeling, and minor repairs/alterations. <br />Building Permit Reinspection $63.25 per State Statute 326B.153 <br />Building Permit Investigation Fee (starting work <br />without an approved/issued permit) <br />Equivalent to permit fee <br />Renewable Energy System (Solar PV Building <br />Permit: Small Rooftop Streamlined, Geothermal, <br />Wind Energy Conversion) – Residential <br />$150 <br />Renewable Energy System (Solar, Geothermal, <br />Wind Energy Conversion) – Commercial <br />See Appendix A <br />Billboards/Billboard Alterations (includes Footings) $250 per billboard plus surcharge <br />Roofing or Siding – Single Family Residential <br /> Partial (less than 25%) of principal structure; or <br /> Detached Accessory Structures only <br />$100 <br />$65 <br />Roofing or Siding – Townhomes and rental <br />properties up to five units <br />$60 per unit <br />Roofing or Siding – Commercial See Appendix A <br />Window or Door Replacement <br />(within existing openings) <br />$65 for one window or door <br />$100 for two or more windows and/or doors <br />Telecommunications Antenna – New System $750 plus engineering/inspection fees if located on City- <br />owned property plus surcharge (see Public Works for <br />further information) <br />Telecommunications Antenna – Repairs/ <br />Alterations/Swapping or Adding Antennas to <br />Existing System (City or Private Property) <br />$250 per permit plus surcharge <br />Electrical Permits, State of MN Established by the Minnesota State Boards of Electricity <br />Fire Inspections (DHS) $50 <br />Fire Panel Systems See Appendix A <br />Fire Permit (no surcharge), All permits unless <br />noted otherwise <br />$100 <br />Fireworks Display/Fireworks Sales $100 <br />Fireworks Sales Only (Businesses) $350 <br />Fireworks Sales with other Retail (Businesses) $100 <br />Fire Permit, Temporary Tent $50 <br />Fire Permit, Tank Installation (fuel, oil, gas, etc.) $100 per tank
The URL can be used to link to this page
Your browser does not support the video tag.