My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-05-2022 WS
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2022
>
12-05-2022 WS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:30 PM
Creation date
1/10/2023 2:33:06 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
12/5/2022
Supplemental fields
City Council Document Type
Packets
Date
12/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City of Mounds View <br />Residential Survey Research Proposal <br />November 2022 <br /> <br /> <br />The City of Mounds View will be presented with bound copies of the final report highlighting all <br />the major findings of the study. The Morris Leatherman Company will also speak to any major <br />differences from and similarities with the past studies of the community, when applicable, in <br />addition to other communities. A volume of all computer-generated cross tabulations and other <br />multivariate statistical techniques will also be included. <br /> <br /> <br />PROJECT SCHEDULE: <br /> <br />1. Planning with City Council Members, City Staff, and/or relevant individuals to establish the <br />topics to be covered in the survey. Based on these topic concepts, the Morris Leatherman <br />Company would word specific, neutral questions. This activity can be completed by a meeting, <br />telephone and/or e-mail, depending on client wishes, within two weeks of the initiation of the <br />contract. <br /> <br />2. Structuring of questions and final approval of the survey instrument. These activities are <br />usually completed within three weeks of the discussion of topics to be covered in the survey. <br /> <br />3. Final determination of the field dates for interviewing. <br /> <br />4. Pre-testing and, if needed, approval of resulting revisions. This activity is usually completed <br />by the second day of fieldwork. <br /> <br />5. Completion of all fieldwork within a two-to-three week period. <br /> <br />6. Computer analysis and preparation of written report. All analytical tests and commentary will <br />be available within six weeks after completion of the fieldwork. <br /> <br />7. Delivery of the final written report and presentation to the City of Mounds View, including <br />presentation graphics. Afterwards, telephone consultation, as the need arises, will be provided <br />about the study’s findings and implications. <br /> <br /> <br />PROJECT COSTS: <br /> <br />The cost of a survey is driven by two factors: sample size and questionnaire length. The cost to <br />conduct a 50 question survey would not exceed $17,500.00. Each additional question would be <br />$160.00. <br /> <br />As company policy, the Morris Leatherman Company requires one-half of the cost prior to the <br />commencement of fieldwork; the remainder is due upon delivery of the final written report. <br />Unless otherwise arranged, the Morris Leatherman Company invoices clients for the initial
The URL can be used to link to this page
Your browser does not support the video tag.