My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-04-20 PC Packet
MoundsView
>
Commissions
>
Planning & Zoning Commission
>
Agenda Packets
>
2020-2029
>
2022
>
2022-04-20 PC Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 12:57:57 PM
Creation date
1/30/2023 3:06:21 PM
Metadata
Fields
Template:
MV Planning Commission
DOC TYPE
PACKETS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Item 05A <br />Page 3of8 <br />The City Arborist has recommendations for different tree <br />species than shown on the plan. <br />Screening and buffering No screening is required between residential properties. <br />Lighting <br />Setbacks (front) <br />Exterior design and materials <br />A photometric plan will not be required as part of the <br />building permit. The Building Permit will need to include <br />confirmation that glare limits are adhered to. Exterior <br />lighting is limited to 0.4 foot-candles (fc) within the property <br />and 1.0 fc measured from the street centerline. All lighting <br />shall be downcast, and the lighting source (e.g. light bulb) <br />shall not be viewable from outside the property.9 <br />Required: 30' minimum <br />Proposed: 56' <br />There are no architectural or design requirements within <br />the R-4 district. There is an intent that new <br />buildings/structures are complementary to existing <br />structures. Any applicable requirements are subjective, <br />and would be added as a condition of approval of the <br />CUP/Development Review. It is noted that the proposed <br />Club House (CMU/EFIS) does not use the same material <br />as the existing buildings (brick/stucco), or roofline, but may <br />be complementary depending on detail. <br />Trash disposal To be replaced <br />Construction timetable 2022 <br />Strategic Plan Strategy/Goal: <br />Continue BR&E program, maximize utilization of development space and current list of available <br />sites, encourage land owners to maintain their properties, & consider residential development. <br />Financial Impact: <br />N/A <br />9 City Code §160.031 (Glare) <br />I Ile IVIUUf1US V Ie.. ..,...... <br />A Thriving Desirable Community <br />
The URL can be used to link to this page
Your browser does not support the video tag.