Laserfiche WebLink
Item No. 6B <br />MEMORANDUM <br />To: Parks & Recreation & Forestry Commissioners <br />From: Pete Szurek — Public Works Superintendent <br />Don Peterson — Director of Public Works/Parks and Recreation <br />Date: November 17, 2021 <br />RE: Public Works Staff Report <br />The following is a synopsis of recent activities and events of the Public Works Department. <br />Maintenance <br />Staff worked on the following items since October 21, 2021; <br />■ Finished Splash pad cleaning —Winterizing <br />• Fished Irrigation Winterizing <br />• Finished Drinking fountain winterizing <br />• Mowing, whipping, trash and litter pickup <br />• Finished Fall Fertilizing at all parks <br />• Leaf pickup and leaf mulching at all parks <br />■ Soccer net and batting cage net removals <br />Forestry <br />Staff worked on the following items this last month: <br />• Resident consults <br />• Right of entry signatures <br />• Hazard Tree remediation and buck thorn removal on Silver View trail <br />The following is the List of Parks and projects / maintenance activities ongoing or planned this year. <br />Current updates are in black text, and updates from the previous two month period are in grey. <br />Ardan Park <br />• Working with Stantec Engineering on some drainage issues in the Park. Application to <br />perform some storm water pond maintenance was submitted to RCWD. <br />• Work to be scheduled for this winter — postponed at this time. Still working with contractor for <br />a date on completion. <br />• Work on ditch completed — some restoration needs to be finished. <br />• Leaf mulching <br />City Hall Campus: <br />• New Picnic Shelters are being built, will be ready for next season rental. <br />• Worked with plumber and vendor to winterize the splash pad. <br />• Installation of the New Picnic Tables started <br />• Wood chipped trees <br />• Irrigation system installation shop <br />• Leaf removal/ mulching <br />• Sun shade removal from the playground area <br />11Page <br />