My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Park Needs Analysis- 2004 List of Needs FINAL VERSION 2-9-2005
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2005
>
02-24-2005
>
Park Needs Analysis- 2004 List of Needs FINAL VERSION 2-9-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2023 1:34:40 PM
Creation date
3/29/2023 1:29:00 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
Documnet Type
Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Redo Silver View Ball Field No. 1 and warning track. DO IN 2005 <br /> <br />Install Sidewalk 8’ from Hillview Road to Hillview Park Shelter front door. DO IN 2005 (This will be constructed by the City) <br /> <br /> <br />Budget (budgeted item for 2005, & 2006) <br /> <br />Carry Over from 2004 <br />(Total Cost estimate -$21,853) <br /> <br />1. Install nets above backstop at Greenfield Park. B ($2,400) DO IN 2005 <br /> <br />2. Add more picnic tables at Hillview Park. Suggested during May 8, 2003 park tour. B ($2,500) TWO MORE TABLES TO BE INSTALLED IN 2005 <br /> <br />3. Resurface roller blade rink at Hillview Park. B ($6,000) DO IN 2005 <br /> <br />4. Replace picnic tables at Oakwood Park. B (One Table-$1,000) DO IN 2005 <br /> <br />5. Install chain-link fence on west end of field for soccer play at Oakwood Park. B ($500) DO IN 2005 <br /> <br />6. Replace doors on building at Random Park. B ($600) DO IN 2005 <br /> <br />7. Crack seal parking lot at Silver View Park. B ($1,520) (seal coat, included@ $6,533.00) DO IN 2005 <br /> <br />8. Replace doors on shelter at Silver View Park. B ($800) DO IN 2005 <br /> <br /> <br />2005 (Total Cost estimate -$37,200) <br />1. Basketball Hoop of Greenfield Park: add to the court next to the tennis courts. Suggested during May 8, 2003 park tour. B ($1,000) <br /> <br />2. Basketball Court of Greenfield Park: look at resurfacing it. Suggested during May 8, 2003 park tour. B ($1,700) <br /> <br />3. Baseball Field of Greenfield Park: Increase the height of the fence ten feet (or 20’total) – right field to center field, tighten netting and re-string support line, Suggested during <br /> May 8, 2003 park tour. B ($16,000)
The URL can be used to link to this page
Your browser does not support the video tag.