Laserfiche WebLink
<br /> <br />Park Building at Groveland Park – replace existing building. 2004 design / 2005 construction C – 2004/2005 ($20,000 in 2004 for Design/ $227,000 in 2005 for Construction) <br /> <br />Playground replacement at Hillview Park. C – 2008 ($32,000 -includes $6,000 for fiberfill) <br /> <br />Park Building at Lambert Park – replace existing building. CIP 2010 design / 2011 construction C – 2010 ($250,000 $20,000 in 2010 for Design/ $230,000 in 2011 for Construction) <br /> <br />Elevation on ballfield and repair drainage ditch at Lambert Park. Park Foreman Recommendation. C – 2007 ($25,000) <br /> <br />Pave the pathway on the northwest corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, 2003 park tour. C – 2007 <br /> <br />Determine the feasibility of developing a small soccer field at the northwest corner of Hillview and Quincy at Oakwood Park. Suggested during May 8, 2003 park tour. C – 2006 ($20,000+$4,000) <br /> <br /> <br />Park Building at Random Park – replace existing building. CIP 2010 design / 2011 construction C – 2012 ($250,000 - $20,000 in 2012 for Design/ $230,000 in 2013 for Construction) <br /> <br />Random Parking Lot – reconstruct the parking lot. C – 2008 ($30,000) <br /> <br />Resurface parking lot at Silver View Park. C – 2008 ($50,000) <br /> <br />Paved trail at Woodcrest Park. C – 2007 <br /> <br />Skate Park – develop a skate park within the City. Currently in CIP for 2006. C – ($55,000) Discuss this on February 24, 2005. <br /> <br />Skate Park Expansion– expand existing skate park. Currently in CIP for 2006. Assumes that a skate parks is constructed and successful. C – 2008 ($20,000)