Laserfiche WebLink
8. Redo Silver View Ball Field No. 1 and warning track. DO IN 2005 <br /> <br />9. Install Sidewalk 8’ from Hillview Road to Hillview Park Shelter front door. <br />DO IN 2005 (This will be constructed by the City) <br /> <br /> <br />B. Budget (budgeted item for 2005, & 2006) <br /> <br />Carry Over from 2004 <br />(Total Cost estimate -$23,353) <br /> <br />1. Install nets above backstop at Greenfield Park. B ($2,400) DO IN 2005 <br /> <br />2. Add more picnic tables at Hillview Park. Suggested during May 8, 2003 <br />park tour. B ($2,500) TWO MORE TABLES TO BE INSTALLED IN <br />2005 <br /> <br />3. Resurface roller blade rink at Hillview Park. B ($6,000) DO IN 2005 <br /> <br />4. Replace picnic tables at Oakwood Park. B (One Table-$1,000) DO IN <br />2005 <br /> <br />5. Install chain-link fence on west end of field for soccer play at Oakwood <br />Park. B ($500) DO IN 2005 <br /> <br />6. Replace doors on building at Random Park. B ($600) DO IN 2005 <br /> <br />7. Crack seal parking lot at Silver View Park. B ($1,520) (seal coat, <br />included@ $6,533.00) DO IN 2005 <br /> <br />8. Replace doors on shelter at Silver View Park. B ($800) DO IN 2005 <br /> <br />9. Lambert Fence in front of team benches at Lambert Park. B ($1,500) DO <br />IN 2005 <br /> <br /> <br />2005 (Total Cost estimate -$37,200) <br />1. Basketball Hoop of Greenfield Park: add to the court next to the tennis <br />courts. Suggested during May 8, 2003 park tour. B ($1,000) <br /> <br />2. Basketball Court of Greenfield Park: look at resurfacing it. Suggested <br />during May 8, 2003 park tour. B ($1,700) <br /> <br /> 2 <br /> <br />