My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/26/2004 Agenda & Packet
MoundsView
>
City Commissions
>
Parks, Recreation & Forestry
>
Packets
>
2000-2009
>
2004
>
08/26/2004 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 1:43:56 PM
Creation date
4/18/2023 2:08:24 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Add air conditioning to the shelter with an air <br /> conditioning unit to be located in the attic. <br /> 5. Provide an alternate bid for removable rubberized <br /> flooring suitable for ice skates (does not currently <br /> apply - possible future activity) <br /> 6. Provide some type of wood or other backing to <br /> aluminum eves to deter damage from hockey <br /> sticks. <br /> 7. Emphasize floor slopes toward floor drains to <br /> provide positive drainage. <br /> C. Meet with Parks Supervisor to review site and building <br /> layouts. <br /> D. Prepare final plan layouts incorporating review <br /> comments. <br /> E. Prepare construction drawings and specifications manual <br /> (Contract Documents). <br /> F. Provide City with one electronic copy and three hard <br /> copy sets of the Contract Documents for use in obtaining <br /> bids. <br /> Ill. Additional Services <br /> Although not part of the original proposal, the consultant firm must have <br /> the ability to provide the City additional services which shall be billable on <br /> an hourly basis, should the City choose to continue with this project and <br /> retain the services of the consultant firm. Said services may include: <br /> A. Further design effort or documentation beyond that described in <br /> Section II, including additional meetings or evaluations requested by <br /> the City. <br /> B. Meetings with the Parks and Recreation Commission or the City <br /> Council. <br /> C. Bidding or construction phase services. <br /> D. Permit application fees. <br /> E. Subsurface exploration testing. <br /> F. Additional field survey may be required. <br /> G. Construction inspection. <br /> IV. Desired Qualifications of Consultant <br /> The consultant firm selected will have a broad base of experience dealing <br /> with architectural and civil engineering projects. The consultant firm <br /> selected shall have the ability to complete the work in a timely manner. <br />
The URL can be used to link to this page
Your browser does not support the video tag.