My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/24/2004 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2000-2009
>
2004
>
06/24/2004 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2024 1:43:16 PM
Creation date
4/18/2023 2:57:11 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Steve Dazenski <br /> City of Mounds View <br /> Proposal for Architectural and Engineering Services <br /> Groveland Park -New Park Shelter <br /> June 21, 2004 <br /> Page 3 <br /> 6. Meet with the OWNER to review layouts. <br /> 7. Prepare final plan layouts incorporating review comments. <br /> 8. Prepare construction drawings and specifications manual (Contract Documents). <br /> 9. Provide the OWNER with one electronic copy and three hard copy sets of the <br /> Contract Documents for use in obtaining bids for the construction. <br /> III. ADDITIONAL SERVICES <br /> If authorized by you, we will furnish or obtain from others Additional Services of the types listed <br /> below which are not considered as basic services under this Proposal. Additional Services shall <br /> be billable on an Hourly Rate basis as defined in Article 3 of the General Provisions, and such <br /> billings shall be over and above any maximum amounts set forth in this Proposal. <br /> A. Further design effort or documentation beyond that described in SECTION II, including <br /> additional meetings or evaluations requested by the OWNER. <br /> B. Meetings with the Park Board or City Council. <br /> C. Bidding or Construction Phase services. <br /> D. Permit application fees. <br /> E. Subsurface exploration or testing. <br /> F. Additional field surveys as may be required, such as registered land or right-of-way <br /> mapping, plats, legal descriptions, topographical, or property boundary surveys, etc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.