Laserfiche WebLink
, <br /> -3- <br /> 1 <br /> 0 Fire protection is the biggest concern. <br /> STORM SEWER AVAILABILITY <br /> The ponding area at this time is about 95% complete, it will handle <br /> all the storm water needs. Slight changes in a few manholes is needed, <br /> these costs to be assessed to our property. <br /> } <br /> PUBLIC UTILITIES & SEWER AND WATER SERVICES <br /> With the design of the 8 Unit Manor Homes, grouping of these services <br /> is more advantageous than with our 4 Unit Townhomes. The Manor Home <br /> has an open area of a 65 foot frontage, whereas the 4 Unit has only a 15 <br /> foot frontage and less. The Manor Homes will have no services under <br /> driveways. <br /> 1 <br /> III TREE PRESERVATION <br /> This is still a very important concern. All the trees in the street <br /> right of ways have been removed. <br /> Additional removal will only be done at time of building construction. <br /> Possible shifting of location to save major trees will be considered since <br /> the Manor Homes are not built on individual lots. The large open area <br /> in front of the Manor Homes would be a possible area of tree preservation. <br /> We would be very happy to work with the City Forester on this <br /> development. <br /> • <br /> STATUS OF DEVELOPMENT SILVER LAKE WOODS March 1982 <br /> A. R-1 & R-2 Residential Area <br /> Site grading, installation of sanitary sewer, water main, storm <br /> sewer have been completed. Topsoil has been spread on all <br /> the lots. A single family model home has been comstructed and <br /> will be open for inspection on the 27th of March. <br /> w' <br /> f <br /> t <br />