Laserfiche WebLink
Parks and Recreation Minutes <br /> Page 2 <br /> • June 4, 1981 <br /> • CHAIRMAN'S REPORT Chairperson Burmiester reported that he had observed the <br /> City Forester moving a number of tree and asked staff <br /> how it was working. Staff responded that we had trans- <br /> planted 14 trees to date and had received a number of <br /> requests for additional donations which will be trans- <br /> planted in the fall . Staff further added that two of <br /> the trees transplanted were a 10' Blue Spruce and an 8' <br /> Norway Pine which were a welcome additions. <br /> LAKESIDE PARK Commissioner Bowman provided some background information <br /> on the states of Lakeside Park. A copy of the joint <br /> powers agreement drafted by staff was distributed and <br /> Commissioner Bowman outlined the beaches progress to <br /> date. <br /> Staff added that the beach opened to the public on May <br /> 30, 1981 and Cindy Johnson had been hired as the water- <br /> • front director. Staff further indicated that there had <br /> been no problem to date. <br /> SILVER VIEW PARK Director Anderson gave a brief update as to the program <br /> that had been made to date regarding Silver View and <br /> then introduced Consultant Gary Tushie who discussed <br /> the plans and specifications for Phase One development. <br /> Consultant Tushie outlined in detail the planning process <br /> entailed in the development of the specifications and <br /> related maps. Commission relating to the plan and the <br /> proposed timeline. <br /> Staff indicated that the timing was poor as the proposed <br /> plans called for cutting 43,000 cubic yards of material <br /> from the Southern edge of the property and than filling <br /> the north end of the property. The Southern "hole" <br /> • would then be filled with dredged material from the pool . <br />