My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/19/95 Agenda & Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
1990-1999
>
1995
>
01/19/95 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 2:07:25 PM
Creation date
5/1/2023 12:43:08 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- <br /> 3535 VADNAIS CENTER DRIVE,200 SEH CENTER,ST PAUL,MN 55110 612 490-2000 800 325-2055 <br /> ARCHITECTURE • ENGINEERING • ENVIRONMENTAL • TRANSPORTATION <br /> December 29, 1994 RE: Mounds View, Minnesota <br /> Miscellaneous Water Resources Services <br /> Review Impacts on Wetland fa. - <br /> Trail Crossing of a Local Ditch <br /> SEH No. A-MOUND9402.00 <br /> Ms. Mary Sarrion <br /> Parks and Recreation Director <br /> City of Mounds View <br /> 2401 Highway 10 <br /> Mounds View,MN 55112 <br /> Dear Mary: <br /> We will be discussing with Mike the possibility of doing your culvert project as part of the sidewalk <br /> on Silver View Road. A proposal will be submitted to Council in January that will authorize us to <br /> do a detailed feasibility study on your project,as well as the sidewalk and sediment pond upstream <br /> of the culvert cross. <br /> I did,however,complete the information you requested. Enclosed is a letter from Kelly Bettendorf <br /> discussing the wetland impacts of your project. The cost to install the culvert is estimated to be <br /> $3,000 to$4,000, plus $5,000 to $10,000 for engineering, plans and specifications,bidding services <br /> and permits. You, thus, should budget $7,500 to $15,000 to install to culvert. I can prepare a <br /> detailed estimate if you wish to pursue installation. <br /> Once the details are worked out, I feel that the total project cost will be closer oser to the 7 500 range. <br /> $ , g <br /> I recommend that if the Council does not authorize a detailed feasibility study as part of the <br /> sidewalk project,we get together and finalize the crossing width, size, etc. so I can get you a more <br /> detailed cost estimate. <br /> Sorry for the delay in getting you this information. If you have any questions,pleased call me at <br /> 490-2026. (I will be out the first week ofy <br /> anuar . <br /> J ) <br /> Sincerely, <br /> Rocky J. Keehn <br /> • tlo <br /> Enclosure <br /> SHORT ELLIOTT <br /> HENDRICKSON INC. MINNEAPOLIS,MN ST CLOUD.MN CHIPPEWA FALLS. WI MADISON, WI <br />
The URL can be used to link to this page
Your browser does not support the video tag.