My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/22/95 Agenda & Packet
MoundsView
>
City Commissions
>
Parks, Recreation & Forestry
>
Packets
>
1990-1999
>
1995
>
6/22/95 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 2:07:25 PM
Creation date
5/1/2023 2:25:09 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• LIST OF CAPITAL NEEDS FOR LAKESIDE PARK <br /> * 1. Need to replace bicycle rack. Approximate cost is $550 for a 18 capacity heavy duty bike <br /> rack plus shipping. <br /> * 2. Need new permanent decorative trash containers, approximately eight. Approximate cost is <br /> $2,000 plus shipping. <br /> 3. Need to replace benches near playground area 2 - 4 benches need replacement. <br /> Approximate cost is $280 each, plus shipping for 8 foot in-ground benches. <br /> 4. Need to replace rules and regulations sign near beach house. Approximate cost is $600. <br /> 5. Parking lot needs replacement. Slurry seal coat is necessary after patching and repairs, <br /> followed by striping. Approximate cost is $8,000. <br /> 6. Lifeguard room needs a new table, chairs, bed, bulletin boards, etc. Approximate cost is <br /> $300. <br /> 7. Need to install a large picnic grill near the picnic shelter for large group rentals. <br /> • Approximate cost is $350 plus shipping. <br /> * 8. Replacement of volleyball nets at $100 each plus shipping. <br /> 9. Replacement of softball field bases, pitching rubbers, home plates, etc. Bases are $200/set. <br /> 10. We found that higher quantities of Copper Sulfate, applied with double strength directly to <br /> the bottom of the lake bed is effective. Therefore, greater quantities of Copper Sulfate are <br /> required for future years treatment of Swimmers Itch. <br /> 11. Playground parts and components always seem to be a need, and replacement can vary <br /> depending upon the item such as diggers, swings, spring animals, etc. Each cost $100 - <br /> $600. <br />
The URL can be used to link to this page
Your browser does not support the video tag.