Laserfiche WebLink
• AET #95-1343 - Page <br /> PROJECT INFORMATION <br /> We understand the athletic field area east of the existingwarming <br /> experienced irregular house at the park has <br /> around movements which has detrimental effects on the athletic activi <br /> We understand you would like to re2rade the athletic field such that it ties. <br /> baseball or soccer can be used for either <br /> purposes. The purpose of this geotechnical exploration and review is to <br /> determine the reasons for the past ground movements, and evaluate fu <br /> options. tore performance and <br /> A second park improvement being considered is the reconstruction or <br /> lot located to the southwest of thew atsurracing of the parking <br /> a house. We assume the parking lot will maintain the <br /> same general surface elevation, Iocation and size as the existing <br /> Primarily intended for automobile parking, � lot. We understand the lot is <br /> and not intended to accommodate heavier truck <br /> •fic. <br /> The presented project information represents our understanding of the proposed construction. <br /> information is an integral pan of our engineering.information <br /> rma ion from gineering review. It is importantoutuif ere <br /> cha <br /> that described so that we can evaluate whether modifications to our recomcontamendations <br /> are appropriate. <br /> SITE CONDITIONS <br /> Surface Observations <br /> The current athletic field area is generally level, although includes rath <br /> central area a er large stockpile in the <br /> The existing parking lot is gravel surfaced, and has noticeable rutting from vehicle traffic. <br /> • <br />