Laserfiche WebLink
MEMO TO: Mound ' e Pl ks and Recreation Commission <br /> 11 <br /> FROM: Staff 101011 <br /> DATE: August 30 , 1983 <br /> RE: Lambert Park tot lot design <br /> Staff has attached two possible tot lot designs that will <br /> fall within the $5 ,000 range that has been budgeted for <br /> equipment at Lambert Park. The two possible designs include <br /> a play booster structure which would include two slides, a <br /> number of ramps and a 360 degree tire swing. The landscape <br /> structure playground module includes a horizontal ladder main <br /> structure with a number of ramps , a wheel, spiral slide, dome <br /> wall, tunnel support and a 360 degree tire swing . Both items <br /> are actually a little bit over the $5 ,000 that is budgeted but <br /> staff feels that they could serve as a main central module from <br /> which the other structures could be relocated. <br /> Staff will be teViewing the Lambert tot lot on our tour on <br /> Thursday evening and will show how the proposed regrouping <br /> of the existing playgrounds will work and how the central <br /> structure as proposed will fit into the remaining area. <br /> • BKA sll <br /> Attachment <br /> • <br />