Laserfiche WebLink
he7Er Too" i�le�vi� <br />• goo" <br />R D C E S- S <br />ldentifv what exists... <br />• Review existing plans, studies, reports and other background infor- <br />mation to understand what has been learned previously. <br />• Tour with local "experts" to gain anecdotal and physical informa- <br />tion about the Highway 10 corridor. <br />• Meet with City staff to learn status of corridor -- planned or poten- <br />tial projectsiand factors that might influence the design theme. <br />• Interview key focus group members about community history and <br />local influences. <br />• Assemble acquired information in graphics, with specific focus <br />provided on identifications of land available for enhancements. <br />Understand what is desired... <br />• Determine !composition of "focus group" (consider representation <br />from City Council, Planning Commission, other City boards, com- <br />munity groups, business/land owners and residents). <br />• Conduct Highway 10 Corridor Workshop One with the focus <br />group, providing the "local knowledge" of corridor issues and <br />community desires and values; and providing interested parties <br />with the opportunity to contribute to the creation of enhancements <br />for the Highway 10 corridor. <br />• Summarize results of Workshop One. <br />Explore what ispossihle... <br />• Generate a range of alternative concepts for the Highway 10 corri- <br />dor, exploring elements that feature various significant community <br />f6atures (landscape, heritage, progressive attitude...). <br />• Review alternative concepts with the focus group at Workshop <br />i1wo, where the purpose is to determine which ideas best reflect the <br />spirit and character of the community; which ideas are most "sup- <br />portable;" which are the most unique or appropriate; or other crite- <br />ria which the community may deem important. <br />• Refine the preferred alternative, or a combination of any of the <br />alternatives, into a final Design Concept for the Highway 10 <br />+Corri dor. <br />I <br />I <br />DOfine the next steps... <br />• Define the responsi. <br />design concepts di <br />• Determine the Levi <br />• Set priorities, esta <br />U •se the steps outh <br />ment to Highway <br />vision created by 1 <br />• Prepare summary <br />next steps. <br />• 1 resent final H <br />Presentation. <br />1 <br />lities and procedures for implementing <br />ped through this effort. <br />design or review required for each element. <br />timetable, and research funding. <br />the <br />above to maintain consistency and commit- <br />orridor enhancements, and adherence to <br />.us group through this process. <br />•t to demonstrate the process, direction <br />the <br />and <br />,ghway 10 Design Concept at a Community <br />Highway 10 Corridor Design ThOme pp <br />City of Mounds View, Minnesota ®e <br />I 4 <br />Hoisington Koegler Group Inc. <br />