Laserfiche WebLink
<x� <br /> ��The Designers' Notebook--1/1 _____ _ w. <br /> �a ,: p <br /> , ry s Irs .W ::n F`S@ fad}/ A,E.4kii "•:,..:.. ...,. <br /> Cost <br /> o'i f' <br /> The initial cost to install a grass paver system will, in most construction costs. <br /> cases, be higher than that of a comparable paved area. This <br /> ilia <br /> cost differential can be reached or eliminated,in many cases, Maintenance costs may be a consideration. Mowing may <br /> because the stormwater drainage system necessary for the be required, and occasional watering may be necessary dur- <br /> parking area can be smaller in size, reducing materials and ing long, dry periods. p <br /> 6 <br /> • _IIIION • 1 • c , 1. , ' • <br /> is•- " !.. - 4.-',+'. <br /> , '- <br /> li♦ /' y - •.uldh i <br /> 4. <br /> • <br /> v Fes^ Y+ •i ', ` . •• • <br /> REFERENCES <br /> 3. Kamedulski,G. E.and McCuen, R. H.,"Evaluation of Alternative c: <br /> 1. Poertner, H.G., "Practices in Detention of Urban Stormwater Stormwater Detention Policies," Journal of the Water Resources ; i <br /> Runoff,"APWA, July 1974. Planning and Management Division,ASCE,Vol.105,No.WR2,Sep- <br /> 2. Lager, J.A. et al, "Urban Stormwater Management and Tech- tember 1979. <br /> nology: Update and Users' Guide," EPA-600/8-77-014, U.S. Envi- 4. American Public Works Association, "Urban Stormwater Man- <br /> ronmental Protection Agency, September 1977. agement, Special Report No. 49,"APWA, 1981. <br /> Prepared for the American Planning Association—Environmental Division by Frank A.Rupp Ill,Illinois Department of Transportation.Illustration by Cynthia M.Montague, <br /> L.A.,Senior Planner,Lake County Department of Planning,Zoning,and Environmental Quality,Waukegan.IL. <br /> 6r <br /> NatureScape July 1982 ` ` <br /> ..... <br />