Laserfiche WebLink
4-• -4- <br /> 1111 <br /> 3 . Minimum lining will be the boundary lines and goal <br /> lines and other lines as established by league <br /> rules. <br /> C . Hockey rink ice - all ice inside the hockey rink <br /> boards. <br /> 1 . Ice will be ready for play by Christmas vacation , <br /> weather permitting . <br /> 2 . Ice surface will be lined by first week in Janu- <br /> ary, weather permitting . <br /> 3 . Lines to include blue lines, red lines , goal lines <br /> and creases. <br /> 4 . Ice to be broomed daily during season . <br /> 5 . Ice surface flooded daily or as use and weather <br /> dictates to provide a smooth, safe , crack free <br /> surface . <br /> 6 . Snow will be removed when 1" of accumulation oc- <br /> curs unless it continues snowing . Snow to be re- <br /> moved immediately after a snow storm ends. <br /> 4111 D. Skating rinks - to be maintained to the same standard <br /> hockey rinks. <br /> E. Tennis Courts <br /> 1 . Courts to be kept in safe playing condition at all <br /> times. <br /> 2 . Nets to be installed as soon as weather is consis- <br /> tently above 50 degrees and removed prior to Nov- <br /> ember , annually. <br /> 3 . Sweep or wash courts once each spring . <br /> F. Sand volleyball courts <br /> 1 . Ensure a safe playing surface when nets are in- <br /> stalled . <br /> 2. Nets put up when weather consistently exceeds 60 <br /> degrees daily. <br /> 3 . Sand surface to be maintained at a minimum of 4" <br /> deep. <br /> 1110 4 . Wood edging inspected weekly for proper fit and <br /> safety. <br /> 5 . Nets inspected weekly for proper tension . <br />