My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12-18-86 Agenda & Packet
MoundsView
>
City Commissions
>
Parks, Recreation & Forestry
>
Packets
>
1980-1989
>
1986
>
12-18-86 Agenda & Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2023 12:40:04 PM
Creation date
5/12/2023 12:16:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> In 1987 , the existing rope system will be replaced and the barrels <br /> currently used will be placed as outside perimeter buoys establishing <br /> a zone of control beyond the swim area. In 1988, the barrels will be <br /> disposed of and four marker buoys will replace them. Addtitional <br /> buoys will be purchased to add to the rope system. If more buoys are • <br /> needed, they may be purchased in 1989. <br /> Item #14, on the list of improvements, repairs of the beach house, <br /> will be an ongoing process . Initially, repairs from vandalism and <br /> heavy use will be dealt with but it is hoped that by the third and <br /> fourth years of the plan, improvements could be made in an attempt to <br /> limit the structural damage that can be done. <br /> It is suggested that a survey of park users and possibly the <br /> neighboring residential areas could be conducted. This survey could <br /> be used to guide the Commissioners and staff in their development of <br /> long term improvements as well as evaluate the existing facility. <br /> PR/sl <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.