Laserfiche WebLink
r <br /> COST ANALYSIS ©ff <br /> LOCATION: Oakwood Park <br /> DATE: May 15, 1986 <br /> III <br /> PREPARED BY: Bruce K. Anderson <br /> DESCRIPTION QUANTITY UNIT MATERIAL LABOR TOTAL COST <br /> Unit Total Unit Total Unit Total <br /> Landscaping & <br /> Earth Berm <br /> (sub 42,000) <br /> Power rake & 7,000 SY .42 $3,000 <br /> sped park – — - <br /> Regrade & ag 450 SY 5 $2,500 <br /> lime field <br /> New bleachers 1 2,000 1 ,500 $3,500 <br /> GT #2311 <br /> Removing concre:e 1 1,500 $1,500 <br /> block <br /> • Fill 2,000 CY 11 $24,00C <br /> Grading 2,000 CY 2.20 $4,500 <br /> Canopy 20 50 $1,000 <br /> Bicycle path <br /> sub 4,750 <br /> 8' Asphalt 480 if 1 9 $4,750 <br /> Picnic Area - <br /> table GT #8724 6 ea 200 $1,200 <br /> Grills GT #49 4 ea 200 $800 <br /> Shelter J <br /> _ GT #2824 _ $6.000__ <br /> Multipurpose <br /> Court _ <br /> hoops & backboards 2 ea 375 450 825 $1,815 <br /> GT #851,_215,__A23 <br /> Fill 450 CY 11 $5,445 <br /> Paving 665 SY 10 $7,300 <br /> Surfacing & <br /> stripping 6 gal . 1 LS _ ` 275 $300 <br /> Under drainage 300 LF 5.85 $1,930 <br /> 6" strip & 665 SY 1. 10 $800 <br /> store topsoil _ _ <br />