Laserfiche WebLink
COST ANALYSIS <br /> LOCATION: City Hall Park <br /> 11111 DATE: May 15, 1986 <br /> PREPARED BY: Bruce K. Anderson <br /> DESCRIPTION QUANTITY UNIT MATERIAL LABOR _ TOTAL COST <br /> Unit Total Unit Total Unit Total <br /> Multipurpose <br /> Court: <br /> hoops & backboards 2 ea 375 450 825 $1,815 <br /> GT #851, 235. 423 -- <br /> Fill 100 CY 11 $1,100 <br /> Paving 665 SY 10 $7,300 <br /> Surfacing & 1 LS 275 $300 <br /> Stripping - 6 aL <br /> Under drainage 300 LF 5.85 $1,930 <br /> 6" strip & store 665 SY 1. 10 $800 <br /> top soil , <br /> • Grading out & <br /> fill 335 CY 2.20 $810 <br /> _Site Amenities: <br /> Bike post 4 ea 50 40 $360 <br /> LS #31 I <br /> Trash receptacl ? <br /> GT #8727 3 ea 55 66 121 $400 <br /> Benches 4 ea 125 150 275 $1, 100 <br />