Laserfiche WebLink
U <br /> COST ANALYSIS <br /> LOCATION: Groveland Park <br /> 111/ DATE: May 15, 1986 <br /> PREPARED BY: Bruce K. Anderson <br /> DESCRIPTION _. QUANTITY UNIT MATERIAL LABOR TOTAL COST <br /> Unit Total Unit Total Unit Total <br /> Landscaping & <br /> Earth Berms: <br /> Sub 40,000 <br /> Earth Berm 725 CY 15 $11,00 <br /> topsoil __ <br /> Soil correction. 1,000 CY 10 $10,00) <br /> tennis courts { _ <br /> Heavy equip. 88 hours 60 4,800 /$5,00 -27-22 <br /> — -- • ✓ <br /> Sod 2,000 yards 1. 25 $3,000 <br /> Canopy trees 50 100 5,000 $ __- <br /> 11111 Flowery trees 30 50 1 ,500 $1,500 <br /> Timbers for tot 200 10 2,000 $2,000 <br /> lot & planters <br /> Seed & fertilizer 2,500 $2,500 <br /> Bicycle paths: <br /> sub 4,800 <br /> 480 LF <br /> 10 $4,800 <br /> Tennis Courts: <br /> Paving (base & 1,470 SY 10 $16,170 <br /> asphalt surface) <br /> Posts, nets, anchors 2 ea 1,184 $1,303 <br /> surfacing & <br /> stripping: <br /> 160 gaT. surfac'ng - - <br /> _6 gal . stripp- ng 1,470 SY 2,268 $2,500 <br /> under drainage 480 LF 585 $3,100 <br /> 'Lighting (35 ft. <br /> candles) : LS 7,650 9,180 16,830 $18,513 <br /> 30' steelP oles. <br /> brackets; 8 <br /> 11111 fixtures - metal — — -- <br /> haylide; 8.64 kw <br /> 1,000 w <br />