Laserfiche WebLink
COST ANALYSIS <br /> LOCATION: Greenfield Park <br /> DATE: May 15, 1986 <br /> PREPARED BY: Bruce K. Anderson, Director <br /> Parks, Recreation and Forestry Dept. <br /> Page 2 of 3 <br /> DESCRIPTION QUANTITY UNIT MATERIAL LABOR TOTAL COST <br /> r <br /> Unit Total Unit Total ( Unit Total <br /> Softball/baseba_1 <br /> lights is 14 000 <br /> Archery range <br /> (15,000 sf) <br /> Grading 556 cy 2.20 1, 345 <br /> 6" strip & store 1,666 sy <br /> 1.10 2,016 <br /> top soil 6" spread <br /> top soil 278 cy 2,90. 88.7 <br /> Finish grading 1,666. sy .55 1,008 <br /> Seeding _ 1 ,666: sy 4 .75 1.375 <br /> Butts a ea 100 330 <br /> Shooting line 64 1f 2.10 148 <br /> Marked nature <br /> trail including, <br /> bird observation -- —" <br /> deck <br /> Bird observation <br /> deck — 1 ea 1,50Q_, 500 2,00Q. <br /> Marked signage 12 ea 75 25 1,200 <br /> Rest areas 711 sy .75 600_ <br /> General <br /> skating _ <br /> Hillview & Quincy <br /> ($8,000 sub) (25,00.0 sf) <br /> 6: strip & store <br /> topsoil 300 sy 1,10 350. <br /> Spread 6" topsoil 500 cy 3.00 125Q0 <br /> Grading, cut & fill 1,000 cy 2,00 2000 <br /> a <br />