Laserfiche WebLink
COST ANALYSIS <br /> s74 <br /> LOCATION: Lambert Park <br /> DATE: May 15, 1986 <br /> PREPARED BY: Bruce K. Anderson <br /> DESCRIPTION QIUANTITY UNIT MATERIAL LABOR TOTAL COST <br /> LUnit Total Unit Total Unit Total <br /> Landscaping & <br /> Earth berms <br /> (sub $36,500) <br /> Earth berms 380 CY 11 $4,000 1 <br /> Utility - — _____I <br /> Utility <br /> develnping_ <br /> Culvert pipe 150 if 24 29 53 $9,000 <br /> cover with <br /> topsoil - 90 CY <br /> ----- , 11 $1,000 <br /> grading & <br /> filling 90 CY 2. 20 $ 200 <br /> Hockey area - <br /> power rake & 1 J <br /> reseed 1,278 SY .42 $ 600 <br /> Permanent <br /> retaining wall _ <br /> 340 if 1,300 Sf 10 $14,000 <br /> Canopy trees 25 100 $2,500 <br /> Flowe-ring .trees 20 50 $1,000 <br /> Shrubs 40 25 $1,000 <br /> Bicycle path - 460 if <br /> 8' asphalt 9 $4,500 <br /> Picnic area 4 <br /> tahles GT R774 ea 190 " 238 418 $1 ,839 <br /> Grills <br /> rT #49 2 ea 185 222 407 $ 895 <br /> Grading cut ii _— -- <br /> fi 11 $'4; CY 2.20 $ 196 <br /> 6" stri & ' �_. <br /> ttnre ptillnpSn 4,400 ` SY 1. 10 $5,324 <br /> 6" spread ;,; ---------� <br /> tnpcni.l 81 CY _ 2.90 $ 260 <br /> Finish grading 4,400 SY `, <br /> .55 $2,662 <br /> Seeding 4,400 SY . 75 $3,620 <br />