Laserfiche WebLink
• <br /> PREPARATION FOR SUMMER PLAYGROUNDS <br /> THESE TASKS NEED TO BE DONE BY JUNE 15 FOR THE SUMMER P OGD D <br /> PROGRAMS: <br /> 1. CLEAN EACH BUILDING MAKING SURE THAT EACH IS VACUUM:-_, _- <br /> CHAIRS, TABLE AND STORAGE AREA IS CLEARED OF ALL RINK <br /> EQUIPMENT SUCH AS SHOVELS, SKATES, ETC. <br /> 2 . EACH BUILDING NEEDS AN OPERABLE FIRE EXTINGUISHER. <br /> 3 . EACH BUILDINGS NEEDS TO HAVE THE DOORS AND WINDOWS <br /> WORKING CONDITION - WINDOWS WITH SCREENS. LOCKS .P_L <br /> BE CHECKED TO BE IN GOOD WORKING ORDER. <br /> 4 . EACH DOOR SHOULD HAVE A PROP SO THAT IT CAN BE PROPPED OPEN <br /> DURING THE DAY. <br /> 5. RINK WALKWAYS NEED TO BE REMOVED INCLUDING MATS AND DOCKS , <br /> 6. INSIDE TRASH RECEPTACLES NEED TO BE PROVIDED. <br /> 7 . INSIDE LIGHT BULBS AND LIGHT COVERS NEED TO BE CHECKED AND <br /> • NEW ONES INSTALLED IF NECESSARY. <br /> 8 . THE RINK BOARDS AT LAMBERT NEED TO BE INSERTED ALONG THE <br /> RINK BOARDS. <br /> 9 . LAMBERT BUILDING ALSO NEEDS TO BE SPRAYED FOR WEED GROWTH <br /> ALONG THE WALLS AND CEMENT APRON. <br /> 10. LAMBERT BUILDING ALSO NEEDS TO BE STAINED OR PAINTED. <br /> 11. LAMBERT BUILDING NEEDS NEW DOORS . <br /> 12 . LAMBERT BUILDING NEEDS CARPET REPAIR TO ENSURE THAT PRESENT <br /> CARPET DOES NOT CONTINUE TO RIP AT THE SEAMS. <br /> 13 . IT WOULD BE NICE TO HAVE THE BB GOAL UP AT HI.i:_, - i1'w AND THE <br /> PICNIC TABLE AT LAMBERT UP BY JUNE 15 SO THAT WE DON'T HAVE <br /> TO GO IN THERE DURING PLAYGROUND ACTIVITIES . <br /> 14 . WOODCREST VB COURT NEEDS A NET UP. <br /> *PARK BUILDINGS NEED TO BE READY TO GO BY JUNE A2 . <br /> • <br />