Laserfiche WebLink
Figure 2.3 Merged Dataset of Field -Collected Survey Data .................................................... <br />Figure 2.4 Stormwater Basin Bathymetry Map........................................................................ <br />Figure 2.5 Stormwater Basin Contour Map.............................................................................. <br />Figure 2.6 TIN Showing Accumulated Sediment within Stormwater Pond .............................. <br />Figure 4.1 Pond Dredging Priority Map.................................................................................... <br />LIST OF APPENDICES <br />Appendix A Maintenance Inspection Reports <br />Appendix B Basin Maps <br />Appendix C Opinion of Probable Construction Costs <br />Appendix D AA-1.P1 and AA-1.P2 Pond Sediment Sampling Results Memo <br />10 <br />11 <br />12 <br />13 <br />21 <br />