Laserfiche WebLink
A 10-year Implementation Plan (Table 4.5) was developed that lays out expenditures by year for the pond <br />maintenance and restoration work. The timing is driven by the need for dredging but can be flexible to <br />meet the needs and budget constraints of the City. <br />iv <br />