Laserfiche WebLink
Mounds View Stormwater Pond Assessment <br />2 METHODS <br />July 2023 <br />2 METHODS <br />2.1 SITE DESCRIPTION <br />31 stormwater basins were initially included in the project; ultimately 27 basins were evaluated. During <br />the site visits, four basins were found to not exist and have potentially been removed. Pond ages range <br />from 18 to 49 years in age. The basins have had varying levels of minor maintenance done on them, but <br />none have had any major maintenance or been dredged. For almost all ponds, detailed as -built plans <br />were not available. Pertinent basin background information is summarized in Table 2.1. <br />3 <br />