My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/07/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/07/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:09 PM
Creation date
8/8/2023 2:50:46 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/24/2023
Supplemental fields
City Council Document Type
Packets
Date
7/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View Stormwater Pond Assessment <br />4 RECOMMENDATIONS <br />July 2023 <br />4 RECOMMENDATIONS <br />Based on the basin analysis, we have identified recommendations for maintenance activities, sediment <br />sampling, assessment and restoration activities, and additional analysis. <br />4.1 DREDGING <br />4.1.1 PRIORITIZATION <br />Dredging priority was determined based on the current sedimentation levels and the rate of sediment <br />accumulation. Dredging is recommended for basins when greater than 50% of the storage volume is <br />filled. Dredging priority was divided into three categories: High, Medium, and Low. <br />High priority was given to basins in which dredging is recommended within the next five years. <br />• Medium priority was given to basins in which dredging is recommended within the next six to ten <br />years. <br />• Low priority was assigned to basins in which dredging is not recommended within the next ten <br />years. <br />Sedimental delta priority was determined based on pond surveys and field observations and also divided <br />into High, Medium, and Low categories: <br />High: Sediment delta is likely impacting pond performance. <br />• Medium: Sediment delta is not currently impacting pond performance but should be monitored <br />closely. <br />• Low: Sediment delta is present but not impacting pond performance and not a concern. <br />Dredging and sediment delta prioritizations can be found in Table 4.1. <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.