My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/07/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/07/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:09 PM
Creation date
8/8/2023 2:50:46 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/24/2023
Supplemental fields
City Council Document Type
Packets
Date
7/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View Stormwater Pond Assessment <br />4 RECOMMENDATIONS <br />July 2023 <br />4.1.2 DREDGING COST ESTIMATES <br />For ponds identified with the potential for dredging within the next 10 years (high or medium priority), <br />planning -level sediment removal costs were developed for the removal of accumulated sediments. The <br />cost estimates are based on 2023 costs, experience with basin excavations and construction, and <br />recently awarded projects. <br />Construction costs were estimated for each pond based on the following factors. <br />Mobilization and demobilization <br />• Site preparation and access <br />• Temporary dewatering <br />• Traffic control <br />• Erosion control <br />• Muck excavation and offsite disposal <br />• Minor storm sewer and structural adjustments <br />Engineering services (15% of total or minimum $10,000) <br />• Testing Services (5% of total or minimum $5,000) <br />• 30% contingency <br />• 6% inflation trend based on target year <br />Table 4.2 outlines those quantities and planning level cost estimates for dredging. <br />These costs do not include wetland mitigation, major structural work, land/easement acquisition, or <br />construction observation. Costs for each pond were calculated as a separate project. It would be <br />beneficial to combine adjacent ponds to save money on all bid items as the project becomes bigger and <br />more economical. <br />The detailed Opinion of Probable Construction Cost conceptual -level estimates for each basin identified <br />in Table 4.2 can be found in Appendix C. <br />Table 4.2 Planning Level Dredging Cost Estimates <br />Basin Name <br />AA-1.1121 <br />-•Target-•• <br />•• <br />98.5 <br />Dredging Year <br />2024 <br />• <br />Priority <br />H <br />Proposed <br />715 <br />-• Total <br />$192,400 <br />AA-1.P2 <br />48.6 <br />2024 <br />H <br />692 <br />$194,900 <br />EW-11.P1 <br />52.4 <br />2025 <br />H <br />871 <br />$244,000 <br />EW-11.P3 <br />60.1 <br />2025 <br />H <br />84 <br />$101,800 <br />SC-2.1121 <br />44.5 <br />2026 <br />H <br />291 <br />$146,900 <br />SC-2.P2 <br />50.5 <br />2026 <br />H <br />299 <br />$149,500 <br />GF-4.P2 <br />83.6 <br />2027 <br />H <br />723 <br />$244,000 <br />SC-4.P3 <br />40.6 <br />2028 <br />M <br />94 <br />$148,900 <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.