My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/07/24
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/07/24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:49:09 PM
Creation date
8/8/2023 2:50:46 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
7/24/2023
Supplemental fields
City Council Document Type
Packets
Date
7/24/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mounds View Stormwater Pond Assessment <br />4 RECOMMENDATIONS <br />July 2023 <br />4.2 UPLAND VEGETATION ASSESSMENT AND RESTORATION <br />The dredging projects will provide the City an opportunity to replace impacted vegetation with more <br />desirable species. Prior to any dredging work, it is recommended that a field assessment of current <br />vegetation conditions be performed at each of the proposed dredging sites along with Silver View Park to <br />inform park user and vegetation management needs and to help the City prioritize management efforts. <br />The vegetation assessment should include a field assessment of current vegetation conditions and the <br />site access required for dredging of the stormwater pond. Dredging projects require large equipment, <br />areas of storage, and will result in significant disturbance of soils, trees, and vegetation of the site. The <br />assessment will help the City determine the best point of access to minimize impacts to desirable <br />vegetation. <br />As part of the assessment, field observations for each site should be summarized in a findings letter that <br />provides a map of each site with the areas evaluated, along with descriptions of cover types and acreage, <br />dominant plant species, invasive or problematic weeds, significant/unique or sensitive features, <br />restoration potential, and high-level management recommendations and cost estimates. Also noted <br />should be areas of erosion, park user safety, educational and recreational opportunities, and constraints <br />that should be considered in managing vegetation associated with the stormwater ponds. <br />Following the field assessment, it is recommended that a public meeting be held to review findings and <br />recommendations and obtain input on park user needs and desires. This will assist with management <br />prioritization, with the goal of developing a list of priority sites, specific activities, and associated costs that <br />should then be incorporated into an upland vegetation management plan. The upland vegetation <br />management plan could be tailored for management tasks being performed by City staff or by contracted <br />services, depending on City preference. <br />4.3 WATER QUALITY ASSESSMENT AND RESTORATION <br />Based on preliminary feedback from the City, a water quality assessment of Silver View Pond is <br />recommended. The goal would be to improve the aesthetics of the pond for park users, including <br />weed/algae growth and odors, and reduce nutrient loading to downstream water resources. <br />Improvements to the pond would be done in conjunction with upland vegetation management and <br />restoration in the area surrounding the pond. <br />The initial step would be data collection, including a site reconnaissance, collection of stormwater <br />infrastructure plans in the pond's drainage area, and in -pond sampling of sediment, water quality, and <br />vegetation. Results of the data collection, particularly the sampling, will drive the potential water quality <br />improvements. As needed, selected water quality modeling would be performed. Potential improvements <br />could include retrofitting of stormwater BMPs; implementing new BMPs within the park; selective <br />dredging, particularly of forebay areas or silt plumes; aeration; chemical addition (e.g., alum); and <br />removal of ecologically undesirable vegetation (chemical or harvesting). Retrofitting of BMPs in the storm <br />sewer system would need to be coordinated with the City's street reconstruction schedule to minimize <br />cost and disruption. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.