Laserfiche WebLink
Fund: 700 Department: 4823 <br />Water Infrastructure & Equipment Maintenance <br />Account <br />Description <br />2021 <br />2022 <br />2023 <br />2024 <br />Description <br />3220 <br />Natural gas <br />8,500 <br />8,500 <br />8,500 <br />8,500 <br />Heating fuel <br />8,500 <br />8,500 <br />8,500 <br />8,500 <br />3610 <br />Memberships <br />120 <br />120 <br />120 <br />120 <br />MN Rural Water Association (50%) <br />100 <br />100 <br />100 <br />100 <br />MN Safety Council <br />60 <br />60 <br />60 <br />60 <br />Suburban Utility Superintendent Association (SUSA)(50% of $100) <br />80 <br />80 <br />80 <br />80 <br />Pressurized vessel license <br />360 <br />360 <br />360 <br />360 <br />3630 <br />Training <br />150 <br />150 <br />150 <br />200 <br />Computer training/webinars <br />1,200 <br />1,200 <br />1,200 <br />1,200 <br />Trench safety/confined space alternate years/inspection safety <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Class A license <br />110 <br />110 <br />110 <br />110 <br />Hearing test/R2K (2.15 FTE * $50) <br />60 <br />60 <br />60 <br />60 <br />Maintenance Expo <br />2,000 <br />2,000 <br />2,000 <br />2,000 <br />Water operator class/exam/certificate ($xxx per person) <br />100 <br />100 <br />100 <br />100 <br />Misc. training seminars <br />300 <br />300 <br />300 <br />300 <br />Equipment operator training <br />150 <br />150 <br />150 <br />300 <br />MRWA workshops <br />400 <br />400 <br />400 <br />800 <br />Tuition reimbursement <br />60 <br />60 <br />60 <br />60 <br />Work zone safety seminar (every 3 years) <br />5,530 <br />5,530 <br />5,530 <br />6,130 <br />4010 <br />Rental, equipment <br />4,000 <br />4,000 <br />1,000 <br />1,000 <br />Skid steer - upgrade <br />300 <br />300 <br />300 <br />300 <br />Barricades & signs <br />200 <br />200 <br />200 <br />200 <br />Tools & equipment <br />4,500 <br />4,500 <br />1,500 <br />1,500 <br />4800 <br />Insurance <br />10,230 <br />10,230 <br />10,230 <br />10,230 <br />Share ofproperty/liability insurance <br />10,230 <br />10,230 <br />10,230 <br />10,230 <br />5110 <br />Repairs, buildings & grounds <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Door & lock repairs <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Roof & wall repairs <br />7,540 <br />7,540 <br />7,540 <br />7,540 <br />Electrical & mechanical repairs (well #2 in 17 well #4 in 18 $4540) <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Site repairs (pavement, fence, irrigation, etc...) <br />10,540 <br />10,540 <br />10,540 <br />10,540 <br />5120 <br />Repairs, vehicles <br />1,000 <br />1,000 <br />1,000 <br />1 3,000 <br />Utility truck repairs <br />1,000 <br />1,000 <br />1,000 <br />3,000 <br />5130 <br />Repairs, equipment <br />900 <br />900 <br />900 <br />900 <br />Well and water treatment plant repairs <br />500 <br />500 <br />500 <br />500 <br />Miscellaneous repairs (Backhoe, Skid steer) <br />1,000 <br />- <br />- <br />- <br />Repair boiler @ main plant <br />- <br />Backhoe overhall extend life 10 more years <br />- <br />Refurbish trailer <br />1,000 <br />1,000 <br />2,000 <br />2,000 <br />Generator service - Onan <br />1,500 <br />1,500 <br />3,000 <br />3,000 <br />VFD service <br />1,000 <br />1,000 <br />1,000 <br />1,000 <br />Meter and valve repairs <br />1,000 <br />1,000 <br />1,000 <br />3,000 <br />SCADA repairs <br />100 <br />100 <br />100 <br />500 <br />Radio repairs <br />7,000 <br />6,000 <br />8,500 <br />10,900 <br />5140 <br />Repairs, streets <br />10,000 <br />10,000 <br />10,000 <br />10,000 <br />Contractor repairs to streets after water main breaks <br />10,000 <br />10,000 <br />10,000 <br />10,000 <br />5150 <br />Repairs, utilities <br />5,000 <br />5,000 <br />5,000 <br />5,000 <br />Fire hydrant repairs <br />5,000 <br />5,000 <br />5,000 <br />5,000 <br />Gate valve repairs <br />7,500 <br />7,500 <br />7,500 <br />7,500 <br />Water main repairs <br />17,500 <br />17,500 <br />17,500 <br />17,500 <br />5155 <br />Water service repairs <br />75,000 <br />75,000 <br />80,000 <br />80,000 <br />Contractor repairs to residential water services. <br />15,000 <br />15,000 <br />10,000 <br />10,000 <br />Pavement & curb repairs <br />90,000 <br />90,000 <br />90,000 <br />90,000 <br />5160 <br />System maintenance <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />Water system maintenance & repair items <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />7030 <br />Capital, equipment > $5000 <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />Gate valves <br />35,000 <br />1,375,000 <br />1,375,000 <br />250,000 <br />Commercial/Residentional meter replacements <br />125,000 <br />- <br />- <br />- <br />Generator WTP #1 and booster station <br />- <br />- <br />37,500 <br />T76 T4 Compact Track Loader (skidsteer)(1/2 in Storm Water) <br />35,000 <br />35,000 <br />45,000 <br />3/4 ton pick-up 4x2 <br />210,000 <br />1 1,425,000 <br />1,472,500 <br />265,000 <br />7050 <br />Construction > $25000 <br />3,816,000 <br />800,000 <br />175,000 <br />275,000 <br />Water treatment plant engineering, design, construction <br />80,000 <br />80,000 <br />60,000 <br />60,000 <br />Well pump rehabilitation project (approximately every 7 years per well) <br />3,896,000 <br />880,000 <br />235,000 <br />335,000 <br />7950 <br />Depreciation <br />240,000 <br />220,000 <br />220,000 <br />200,000 <br />Estimated depreciation <br />240,000 <br />220,000 <br />220,000 <br />200,000 <br />9100 <br />Contingency <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />Contingency <br />15,000 <br />15,000 <br />15,000 <br />15,000 <br />4,598,485 2,778,278 2,211,152 1,094,952 <br />81 <br />