My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-10-2023 EDA
MoundsView
>
Commissions
>
Economic Development Authority
>
Agenda Packets
>
2020-2029
>
2023
>
04-10-2023 EDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2025 9:15:09 AM
Creation date
9/18/2023 1:02:02 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
Economic Development Authority
Commission Doc Type
Agenda Packets
MEETINGDATE
4/10/2023
Commission Doc Number (Ord & Res)
0
Supplemental fields
Date
4/10/2023
EDA Document Type
Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Exhibit A Page 4 <br />DOCSOPEN\MU205\13\867249.v2-4/5/23 <br />a third-party contractor for marketing support. Borrowers will pay all mortgage filing fees and related <br />closing costs. <br /> <br />Total Project Cost: It is the borrower’s responsibility to obtain the amount of funds necessary to finance <br />the entire cost of the work. In the event the final cost exceeds the original loan amount, the borrower <br />must obtain the additional funds and show verification of the additional funds in order to be approved <br />for the loan. <br /> <br />Disbursement Process: Payment to the contractor (or owner in sweat equity situations) will be made <br />upon completion of work. An inspection will be performed by a City Inspector and/or the City’s <br />authorized representative to verify the completion of the work. The following items must be received <br />prior to final disbursement of funds: <br />• Final invoice or proposal from contractor (or materials list from supplier); <br />• Final inspection verification by a City Inspector or the City’s authorized representative; <br />• Completion certificate(s) signed by borrower and contractor; <br />• Lien waiver for entire cost of work; and <br />• Evidence of City permit (if required). <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.