My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
January Meeting Packet
MoundsView
>
City Commissions
>
Parks, Recreation & Forestry
>
Packets
>
2020-2029
>
2022
>
January Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2023 1:43:55 PM
Creation date
9/26/2023 1:42:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Staff Report <br />Groveland Park: <br />• Tennis lights repaired breakers replaced <br />Greenfield Park: <br />• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />Hillview Park: <br />• Bathroom locks repaired interior and exterior <br />• Hockey light checks and bulb replacements <br />Lambert Park: <br />• Exterior drinking fountain repaired, it was pulled loose from the building. <br />• Hockey light checks and bulb replacements <br />Oakwood Park: <br />Random Park: <br />• Working with contractor on dates for install of new playground. <br />Silver View Park: <br />Trail buckthorn removal <br />• Silverview Pond East — Kasco Circulator installation <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park. <br />Application to perform some storm water pond maintenance was submitted top RCWD. <br />• Met with contractor — work will be scheduled for this winter — postponed <br />2 1 P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.