Laserfiche WebLink
Public Works Staff Report <br />Groveland Park: <br />• Tennis lights repaired breakers replaced <br />Greenfield Park: <br />• Notified by the DNR that corrections to be made to the tennis court gate entrance — ADA <br />accessible. Fencing contractor scheduled for next month Leveled the trail running in the back <br />portion of the Park, added class 5 as needed. <br />Hillview Park: <br />• Bathroom locks repaired interior and exterior <br />• Hockey light checks and bulb replacements <br />Lambert Park: <br />• Exterior drinking fountain repaired, it was pulled loose from the building. <br />• Hockey light checks and bulb replacements <br />Oakwood Park: <br />Random Park: <br />• Working with contractor on dates for install of new playground. <br />Silver View Park: <br />Trail buckthorn removal <br />• Silverview Pond East — Kasco Circulator installation <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park. <br />Application to perform some storm water pond maintenance was submitted top RCWD. <br />• Met with contractor — work will be scheduled for this winter — postponed <br />2 1 P a g e <br />