Laserfiche WebLink
Public Works Staff Report <br />• Turn on building water by May 2nd 2022 <br />Woodcrest Park <br />• Working with Stantec Engineering and Ramsey County on some drainage issues in the Park. <br />Application to perform some storm water pond maintenance was submitted top RCWD <br />Met with contractor — pond work potentially 2022 <br />Volunteer group will be picking up trash at Groveland Park on MaV 15th at 9AM <br />31 Page <br />