My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-28-2023 PRF Packet
MoundsView
>
Commissions
>
Parks, Recreation & Forestry Commission
>
Agenda Packets
>
2020-2029
>
ing)
>
09-28-2023 PRF Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2024 1:36:13 PM
Creation date
9/29/2023 12:27:27 PM
Metadata
Fields
Template:
MV Parks, Recreation & Forestry Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
7A <br /> Quote CENTURY FENCE <br /> Century Fence Company COMPANY <br /> 14839 Lake Dr NE SINCE 1917 THE MARK OF PERMANENCE <br /> Forest Lake,MN 55025 <br /> Quote To: Project Location: Quote t.13245 <br /> Pete Szurek Mounds View Silverview and City Hall Parks Quote Date:9/222022 <br /> CITY OF MOUNDS VIEW <br /> 2401 HIGHWAY 10 <br /> MOUNDS VIEW,MN 55112 <br /> Desaiption <br /> ,Silver View Park <br /> Furnish and install 865 LF of 6 Foot high galvanized chain link fence.Line posts shall be 2"O.D.Galvanized steel pipe Driven 48"in <br /> depth and spaced a maximum of 10'on centers.The fence shall consist of top rails which will be 1-5/8"O.D.Galvanized pipe.The fence <br /> shall consist of bottom tension wire. <br /> •8-End post 2-1/2"O.D.Galvanized pipe-Concrete Set <br /> •2-Corner post 2-1/2"O.D.Galvanized pipe-Concrete Set <br /> •6-Gate post 4'O.D.Galvanized pipe-Concrete Set <br /> •2-Single Slide Galvanized Gate:12'Opening Width <br /> (4)10'x20'Dugout Shade Structures <br /> $102,000 updatea cost estimated on 6/23/23 at$36,600 for the fence and$74,000 for the dug outs,for a total$110000.00 <br /> City Hall Park <br /> Furnish and install 465 LF of 6 Foot high galvanized chain link fence.Line posts shall be 2"O.D.Galvanized steel pipe Driven 48'in <br /> depth and spaced a maximum of 10'on centers.The fence shall consist of top rails which will be 1-5/8"O.D.Galvanized pipe.The fence <br /> shall consist of bottom tension wire. <br /> •4-End post 2-1/2"O.D.Galvanized pipe-Concrete Set <br /> (2)10'x20'Dugout shade structure <br /> $48590 updated cost estimated 6/22123 at$15,90C for the fence and$37 000 for the dug outs for a total of$52.900.00 <br /> Pads and Maintenance Strip Silver View <br /> (4)Pads 12'x22' <br /> 890'of Maintenance Strip <br /> $86,200 <br /> Concrete Pads and Maintenance Strip City Hall <br /> (2)Pads 12'x22' <br /> 385'of Maintenance strip <br /> $40,450 <br /> Notes: <br /> Excludes Excavation through rock,Excavation through frost Hydro-excavating,Permit Prevailing Wages,Private Utility Locate,Survey, <br /> Site Restoration(top soil,seed etc-) <br /> Quote Valid For 15 days <br /> Buyers Signature: Date: Submitted by: ciadieff <br /> This quote when accepted in writing by purchaser and by Century Fence Jason Larson <br /> Acceptance: Company becomes a contract between two parties.The conditions on the Office:651-464-7373 <br /> attached'Terms and Conditions'are made a part of this contract. Ce11:612-666-1680 <br /> Terms of Payment: Net Cash upon receipt of invoice. Email:JLarson@centuryfence.com <br /> 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.