2024 Mounds View Fee Schedule Page 3 of 14
<br />Fire Permit, Temporary Tent $50
<br />Fire Permit, Tank Installation (fuel, oil, gas, etc.) $100 per tank
<br />Fire Permit, Tank Removal $50 per tank
<br />Fire Permit, Operational $50 per year
<br />Fire Permit, Chemical Fire Suppression $100
<br />Fire Sprinkler Systems See Appendix A
<br />Fire Sprinkler Plan Check 65% of permit (for new construction or 20 heads
<br />or more only)
<br />Mechanical Permit, Residential (State Surcharge
<br />Required, See Appendix B)
<br />Minimum $60 or 2% of Valuation, whichever is
<br />larger
<br />Mechanical Permit, Commercial (State Surcharge
<br />Required, See Appendix B)
<br />See Appendix A
<br />Plumbing Permit, Residential (State Surcharge Required,
<br />See Appendix B)
<br />Minimum $60 or 1.25% of Valuation, whichever is
<br />Larger
<br />Plumbing Permits, Commercial (State Surcharge
<br />Required, See Appendix B)
<br />See Appendix A
<br />
<br />Plumbing Permit Plan Review, Commercia:l
<br />
<br />Plumbing system plans and specifications that are submitted to the City of Mounds View for review
<br />shall be accompanied by the appropriate plan examination fees shall be paid prior to plan approval.
<br />The City of Mounds View shall charge the following fees for plan reviews and audits of plumbing
<br />installations for public, commercial, and industrial buildings:
<br />1. Systems with both water distribution and drain, waste, and vent systems and having:
<br />a. 25 of fewer drainage fixture units, $150
<br />b. 26 to 50 drainage fixture units, $250
<br />c. 51 to 150 drainage fixture units, $350
<br />d. 151 to 249 drainage fixture units, $500
<br />e. 250 or more drainage fixture units, $3 per drainage fixture unit to a maximum of $4,000;
<br />and
<br />f. Interceptors, separators, or catch basins, $70 per interceptor, separator, or catch basin
<br />design
<br />2. Building sewer service only, $150
<br />3. Building water service only, $150
<br />4. Building water distribution system only, no drainage system, $5 per supply fixture unit or $150,
<br />whichever is greater
<br />5. Storm drainage system, a minimum fee of $150 or:
<br />a. $50 per drain opening, up to a maximum of $500; and
<br />b. $70 per interceptor, separator, or catch basin design
<br />6. Manufactured home park or campground, one to 25 sites, $300
<br />7. Manufactured home park or campground, 26 to 50 sites, $350
<br />8. Manufactured home park or campground, 51 to 125 sites, $400
<br />9. Manufactured home park or campground, more than 125 sites, $500
<br />10. Revision to previously reviewed or incomplete plans:
<br />a. Review of plans for which the city has issued two or more requests for additional
<br />information, per review, $100 or ten percent of the original fee, whichever is greater
<br />b. Proposer-requested revision with no increase in project scope, $50 or ten percent of
<br />original fee, whichever is greater
<br />c. Proposer-requested revision with an increase in project scope, $50 plus the difference
<br />between the original project fee and the revised project fee---
<br />
|