My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/10/23
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/10/23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:50:39 PM
Creation date
10/25/2023 1:16:56 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
10/23/2023
Supplemental fields
City Council Document Type
Packets
Date
10/23/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Meter <br />City cost plus 10% administrative fee <br />Water Meter Radio Remote Reading Device <br />City cost plus 10% administrative fee <br />Curb Stop — Valve Cover <br />City cost plus 10% administrative fee <br />Municipal Sanitary Sewer System Fees (Title V, Chapter 52 <br />1/1 Application Fee — H2OPP Program <br />$150 per lateral line <br />Sewer Service Availability Charge SAC <br />$2,485 per Metropolitan Council Environmental Services <br />Sewer Usage Rate <br />Per Quarter <br />Sewer Usage Rate <br />Sewer Service Charge, Residential <br />$49 3.64 er 1,000 gallons water sold per quarter <br />Q^� 45.69 per residential equivalent unit (REU) <br />connection per quarter <br />Sewer Service Charge, Commercial/Industrial/ <br />Public Buildings and Churches <br />Sewer Connection/Repair/Disconnect <br />$104.88 $112.22 per REU connection per quarter <br />$100 plus surcharge <br />Sewer Unit Charge (New Connection Only) <br />$150 per connection <br />Sewer Inspection or re -inspection after hours. <br />Call -out rate per visit Minimum 2 hours <br />Surface Water Management (SWM) Utility Fees (Title V, Chapter 53) <br />SWM New Construction, R-1 <br />$212 per lot <br />SWM New Construction, R-2 <br />$1,038 per acre <br />SWM New Construction, R-3, R-4, R-O <br />$1,500 per acre <br />$1,500 per acre <br />$2,096 per acre <br />SWM New Construction, B-1, B-2, B-3, B-4 <br />SWM New Construction, 1-1, PUD <br />SWM Utility Rate Charge, R-1 Single Family and <br />$16.89 $17.00 per unit per quarter <br />R-2 Single and Two Family Residential <br />SWM Utility Rate Charge, R-3 Medium Density <br />$8737 $92.83 per acre per quarter <br />Residential <br />SWM Utility Rate Charge ,R-4 High Density <br />$103.60 $110.08 per acre per quarter <br />Residential, R-5 Mobile Homes and R-O <br />Residential Office <br />SWM Utility Rate Charge ,B-1 Neighborhood <br />$135.71 $144.19 per acre per quarter <br />Business, B-2 Limited Business, B-3 Highway <br />Business and B-4 Regional Business <br />SWM Utility Rate Charge, 1-1 Industrial <br />$449-.96 $116.83 per acre per quarter <br />SWM Utility Rate Charge, PUD Planned Unit <br />$429.16 $127.67 per acre per quarter <br />Development <br />SWM Utility Rate Charge, CRP Conservancy, <br />$16.80 $17.00 per acre per quarter <br />Recreation and Preservation <br />SWM Utility Rate Charge, School or Church, <br />$48.76 $51.81 per acre per quarter <br />Public or Private <br />To be determined by the Public Works Director on a case - <br />Illicit Discharge Fee <br />by -case scenario. <br />Storm Water Management (The permit fee schedule adopted 12/08/2021 by the Rice Creek Watershed District <br />Board. The fee for a permit is the cumulative total of all individual aspects of a project. Government entities are <br />xempt from the permit fees). <br />Rule C (Storm water Management): <br />Residential, Commercial, Industrial, Institutional <br />development that proposes less than 5 acres of new <br />and/or reconstructed impervious surface <br />$3,000 non-refundable fee due at time of application. <br />Once application review costs (District Engineer and <br />Legal Counsel) exceed $9,000*, any additional cost <br />2024 Mounds View Fee Schedule Page 13 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.