My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 2023/11/13
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
2020-2029
>
2023
>
Agenda Packets - 2023/11/13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:51:07 PM
Creation date
11/14/2023 12:20:48 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
11/13/2023
Supplemental fields
City Council Document Type
Packets
Date
11/13/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INDEX <br />I. Building/Community Development Fees Page 2 <br />I/. Other Inspection / Planning Fees Page 3 <br />lll. Miscellaneous copies, maps, agenda, etc. Page 5 <br />IV. Police/Administrative Offenses Page 5 <br />V. Licenses Page 6 <br />Vl. Parks, Recreation, and MVCC Facility Rental Fees Pa e 8 <br />Vll. Public Works/Municipal Utility Fees M E7 Page 11 <br />Appendix A — 2022 MN State Statutes: 326B.153 Building Permit Fees <br />Appendix B — 2022 MN State Statutes: 326B.148 Surcharge <br />I. BUILDING/COMMUNITY DEVELOPMENT RELATED FEES <br />Building Permit (State Surcharge Required, See Appendix <br />Fees shall be based on valuation according to <br />B) <br />Appendix A, unless specifically noted otherwise or <br />as determined by the Cit 's Building Official <br />Building Permit Plan Review <br />65% of Building Permit Fee (Building Official may <br />waive plan review fee for certain projects that <br />require diminutive plan review such as partial <br />basement finishes, kitchen remodeling, and minor <br />repairs/alterations. <br />Building Permit Reins ection <br />$63.25 per State Statute 326B.153 <br />Building Permit Investigation Fee (starting work without an <br />Equivalent to permit fee <br />approved/issuedpermit) <br />Renewable Energy System (Solar PV Building Permit: <br />$150 <br />Small Rooftop Streamlined, Geothermal, Wind Energy <br />Conversion) — Residential <br />Renewable Energy System (Solar, Geothermal, Wind <br />See Appendix A <br />Energy Conversion) — Commercial <br />Billboards/Billboard Alterations (includes Footings) <br />$250 per billboard plus surcharge <br />Roofing or Siding — Single Family Residential <br />$100 <br />Partial (less than 25%) of principal structure; or <br />$65 <br />Detached Accessory Structures only <br />Roofing or Siding — Townhomes and rental properties up <br />$60 per unit <br />to five units <br />Roofing or Siding — Commercial <br />See Appendix A <br />Window or Door Replacement <br />$65 for one window or door <br />(within existing openings) <br />$100 for two or more windows and/or doors <br />Telecommunications Antenna — New System <br />$750 plus engineering/inspection fees if located <br />on City -owned property plus surcharge (see <br />Public Works for further information) <br />Telecommunications Antenna — Repairs/ <br />$250 per permit plus surcharge <br />Alterations/Swapping or Adding Antennas to Existing <br />System (City or Private Property) <br />Electrical Permits, State of MN <br />Established by the Minnesota State Boards of <br />Electricity <br />Fire Inspections DHS <br />$50 <br />Fire Panel Systems <br />See Appendix A <br />Fire Permit (no surcharge), All permits unless noted <br />$100 <br />otherwise <br />Fireworks Display/Fireworks Sales <br />$100 <br />Fireworks Sales Only Businesses <br />$350 <br />Fireworks Sales with other Retail (Businesses) <br />$100 <br />2024 Mounds View Fee Schedule Page 2 of 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.