My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Resolution 9816
MoundsView
>
Commissions
>
City Council
>
Resolutions
>
09500 - 09999 (2021-2024)
>
Resolution 9816
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 4:55:49 PM
Creation date
11/15/2023 10:46:52 AM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Resolutions
MEETINGDATE
11/13/2023
Commission Doc Number (Ord & Res)
9816
Supplemental fields
City Council Document Type
Resolutions
Date
11/13/2023
Resolution/Ordinance Number
9816
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Resolution 9816 <br />Page 6 of 7 <br />b. Where plan review is performed on any permit, a minimum plan <br />review fee of $50.00 shall be payable to the Contractor. <br />D. Plumbing Plan Review Services. The Contractor is authorized and <br />responsible to act in the capacity of "administrative authority" as defined in the <br />Minnesota State Plumbing Code 4714.0203 for plumbing plan review for commercial <br />construction and remodel work as found in Minnesota Rules 1300.0215, Subd. 6 and <br />Minnesota Statute 326B.43, Subd. 2. The Contractor is authorized to bill the jurisdiction <br />85% of plumbing plan review fees. <br />E. Fire Sprinkler/Alarm Plan Review Services. The Contractor is authorized <br />and responsible to act in the capacity of "administrative authority" as defined in <br />MN Statute 29917.011 for plan review and inspection services for new and <br />remodel commercial work related to fire sprinkler and alarm systems. Permits <br />are required as specified by Section 105 of the MN State Fire Code. The <br />Contractor is authorized to bill the jurisdiction 85% of fire sprinkler and alarm <br />system plan review fees. <br />F. Transportation Costs. The Contractor shall provide transportation to <br />meetings and site inspections within the Jurisdiction at no additional cost in <br />situations where the Contractor has received a percentage of the permit fee. <br />When projects are billed at an hourly rate, transportation costs will include <br />travel time to the various inspection(s) while within the jurisdiction limits. <br />G. Septic Systems. The Contractor may provide system design review and <br />inspection services for residential and commercial septic systems. <br />a. New residential septic systems, the Contractor is authorized to bill the <br />jurisdiction at a rate of $250.00. <br />b. Alteration and repair services for residential septic systems will be billed <br />at a rate of <br />$200.00. <br />c. The Contractor is authorized to bill the jurisdiction for review and <br />inspection services for new commercial and alteration/repair <br />commercial septic systems, in accordance with Minnesota Statute <br />326B.153, Subdivision 1. The minimum fee for all new commercial <br />septic systems will be $250.00. <br />d. The Contractor will receive 15% of permit fees captured on all <br />advanced septic systems. <br />
The URL can be used to link to this page
Your browser does not support the video tag.